Laserfiche WebLink
January 28, 2010 5 093-93256,700 <br />3.0 CONSTRUCTION STORMWATER BMPS <br />According lo the SWMMWW, there are hvelve elemenis o( construclion slormwater pollution prevention <br />lhal must be considered and included in the SWPPP. These twelve elements are discussed m Ihe <br />following sedions. If site conditions render an element unnecessary. a justification for exemption is <br />provided. <br />The SWMMWW, incorporaled inlo lhis Plan by reference, provides su9gested BMPs tor each of the <br />hvelve eiements. The BMPs applicable to Ihis projed and their SWMMWW numbers are listed below and <br />described in greater detail in Appendix B. Alternate BMPs tor pertinent SWPPP elements are included in <br />Appendiz C. Altemate BMPs are included as a quick reference tool for Ihe on-site inspector in the event <br />that the BMPs 65ted in this section proves lo be inette�tiv� or inappropriate durmg construction to satisty <br />the requirements of the NPDES Permit To avoid potential erosion and sediment control problems, the <br />Certilied Erosion and Sediment Control �ead (BMP C 160) witl promptiy initiate ihe implementation of one <br />or more of the altemalive BMPs listed in Appendix C atter determining that exis6ng BMPs are inettecfive <br />or failfng. <br />All earthwork adivities will be peAormed during the dry season. Behveen October 1, 2010 and April 30, <br />2011, no earthwork activities will be pertormed on the site, unless approved by the perm�fling agency. I( <br />the permanent BMPs have not been installed by the beginning of ihe wet season, the :ite will be <br />temporarily stabiGzed as necessary by October 1, 2010 in preparation for the wet season shutdown. <br />Temporary BMPs Ihat have already been installed will be retained over Ihe wet season. <br />3.1 Element #1 - Mark Clearing Limits <br />To reduce the area of dlsturbed (i.e., potenlially erodible) soil, the limds ot .onstroclion will be clearly <br />marked in the field belore land-disturbing activities begin. The BMPs relavant to marking Ihe clearing <br />limds that will be applied lor this projecl include� <br />■ High Visibility Plastic or Metal Fence (BMP C 103) <br />The site boundaries wdl be delineated wilh high-visi6iliry (orange) safely fence or a combinalion o( high- <br />vislbility plastic lence and standard (black) sdt fence. No disturbance beyond Ihe clearing limits during the <br />construction period wili be allowed. <br />3.2 Element #2 - Establish Construction Access <br />No wnstruction access BMPs are required for this projecL Exis6ng gravel site access roads along ihe <br />north side of the site wlll be the primary access poinls. <br />3.3 Element #3 - Control Flow Rates <br />No flow conlrol BMPs are required for this project. Stormwater runofl from the project site will be <br />discharged directly to wastewater treatmenl ponds that are �art of an NPDES•permiried treatmenl system <br />thal discharges to Sleamboat Slough through a conslrucled conveyance system. Addilionally, <br />