Laserfiche WebLink
January 28 2010 8 093-93256.100 <br />or other conlainmenl BMPs will be installed across the channels where lhey leave the construclion area, <br />as described in other elements. <br />Check dems wlll be installed al regular intervais within lhe western poAions of the perimeter dreinage <br />ditches, which convey slormwater to the existmg west drainage ditch. <br />Temporary or permanent seed (or the grass-lined perimeter ditches will be applied early enough to <br />achieve germinadon prior to the wet season. <br />3.9 Element #9 - Control Pollutants <br />AI! oollutants. inctuding waste materiats. Ihat occur on sit> will be handled ard disposed of in a manner <br />that does nol cause conlammation of surface water. Good housekeeping and preventative measures will <br />be taken to ensure that the site is kept clean, we" organized, and free of debns. If required, are disws=ed <br />belaw <br />Care will be taken to avoid disurbing the dredge spods during vegetalion removal and cap construction <br />actrvities. If the spo7a are inadvertenUy disturbed, any spoil material will be removed from equipment or <br />vegetalian prior to leaving Ihe work area. Where spoils become exposed at the ground surface, they shall <br />be covered wdh a minimum E-inch•ihick layer of clean soil wdhin 24 hours or before an expected rainfall <br />event, whicheverissoOner. <br />For this project, vehicles. construdion eqwpment, andlor pe!roleum product storage/dispensing represent <br />the main polential sources of polWlanls. The BMPs that will be implemented to conlrol these sources of <br />palNtion include: <br />■ A�I vehicles, equipment, and petroleum producl sbrageldispensing areas w+!I be <br />inspected regularly to detect any leaks or spills and to idenlify maintenance needs to <br />prevent leaks nr spills <br />■ No petroleum produd storage wdt occur at the site. Petroleum produds will be stored on <br />other portions o( the adjacent PTI propeAy These areas have appropnate spol control <br />and countermeasures in place. <br />■ All vehicles and equipment, induding tueling trucks, will have spill conlrol klts wdh them <br />and operating personnel will 6e lrained in iheir use <br />■ Drip pans or equivalent wlll be piaced under all polenlial spol localions during fueling. <br />■ No onsile mamlenance and/or non-emergency repair ol vehicles or equipment will be <br />allowed. Maintenance and/or non-emergency repair of vehicles or equipment will occur <br />on olher portions of the PTI property. Work in these areas will use appropriale spill <br />wntrol and countermeasures. <br />■ In order to perlorm emergency repairs on sde, �emporary plaslic wlll be placed benealh <br />and, if raining, over the vehicle. <br />■ Contaminated soil will be removed and p�aced in secure containers or otherwise cleaned <br />up immediately follow:ng any discharge or spill incident. <br />The project does nol require a S{�ill PreveMion, Control, and Ccuntermeasure Plan under the federal <br />regulations of the Clean Watrr n•�t. <br />-"' - <br />F Golder <br />o�: s�a�.n� �: m a,e:.w�v c:.� /�5SOC7fltCS <br />