Laserfiche WebLink
drainage, and temporary construction erosion control. Public Works Department <br />approval of these drawings is required prior to any permRs being issued. <br />2. City streets are to be kept clear of dirt and debris at all times during construction. <br />Dust suppressio� and street cleaning must occur as directed by the Public Works <br />Inspector. <br />3. Before the site is used for any other activity other than consirudion of the cap as <br />depicted in the approved plans the applicant first must obtain from the City all relevant <br />land use and/or construction permits. <br />APPEALS: This determination may 6e appealed to lhe Land Use Hearing Examiner. <br />Any such appeal must be filed within 14 days of the date specified below. Appeal forms <br />are available from the Planning Department and must be submilted aiong with the <br />required fiting fee. For more infomiation concerning this determination, conlact John <br />Jimerson at (425) 257-8737. <br />