My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />UNION SLOUGH MARSH MIT[GATION <br />14. <br />I5. <br />SUPPLEMENTpRy CpIY�D(N'�'►p � <br />subsequent activities shall be connected at the appropriate node to show <br />interdependency and the method of conswction. Denoted on w�h arrow shall be <br />the activity name, pldnned duration of that activity, the craft or trade responsibk <br />for that activity, manpower, equipment, location and dollar value. Duratiuns shall <br />be in work days. Non-activity restraints betwan activities shall be shown hy a <br />dashed line connxting the appropriate nodes of tM� rostrained activity. <br />Activities shall include the purchasing of long kad itert►s, shop drawing review, <br />City and utility cnmpany coordination, and other p�ni�nt activities as well as <br />actual consdvction activities. No activity snall be (onger than 30 days. Activicies <br />longer tha� 30 days shall be sub-divi;Jed. Since paym�nt �� ��� ro the <br />completion of planned acNvrties, the description of activities must provide enough <br />detail to allow th; Enginar to match the actual work performed with a unique and <br />definite activity on the scheduk. � <br />AunLcabk W3¢e Ra� <br />A. R�'''r"""., Pubtic works contracts roquire that tach and e�,ery �rr�p�oyer on the <br />project fik the Statement of G,tent to P::y Provailing Wages (Intent), and Affidavit <br />of Wages Paid (Affidavii) forrtu. The fo�•ns are filed with the depaztrnent and, <br />once they are approved, are sutxnitted by the employer to the agency administering <br />the contract. RCW 39.12.040, <br />B. In n. The Intent form is filed irnrtrdia���y ��. �� contract is awazded and <br />before work begins, if that is possibk. The agency adrrriniscaing �h� contract may <br />not malce any paym,:nts until all contractors have submitted an I,�tent form that has <br />been approved by the Industrial Statistician. RCW 4g,23,030, 040, and 042. <br />C• Afiidavits. The Atiidavit fom� is not filed until after ofi the work is completed. <br />The agency adminisc�Mg the contract may not release finai retainage until all <br />contractors have submitted an Affidavit fortn that has been ca:rtified by the <br />Industrial Statistician. RCVy 3o,12,Oqp and 042. <br />Contraccor's Mobil��arc�� <br />Mobilization consists of preco�.swction expenses and costs of prepazatory work <br />and operations perfomr,d by the Contractor that aze not defined as a pazt of a <br />payment item <br />Payment for mobilization will be rnade on the following basis; <br />a• 40 percent afrer completion of 5 percent of the total contract amount of <br />other bid items have bcen eamed, <br />r, <br />� <br />, <br />l� <br />
The URL can be used to link to this page
Your browser does not support the video tag.