My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POR'I OF EVCRETT SE(TION (10800 <br />UWION SLOUGH MARSH MITIGATION SUPPLEMENTARY ('ONDITIONS <br />b. 80 percent after completion of 50 percent of the total contract a mount of <br />other bid items Iiave been earned. <br />16. <br />� <br />c. 100 percent afrer completion of all work on the project has been earned, <br />including cleanup and acceptance of the project by the Owner. <br />Enumeration of Drawing as nd S[�ecifications <br />Follo�ving aze the drawings and specifications which form a part of the Cootract <br />Documents as defined under ARTICLE 1 of the GENERAL CONDITIONS: <br />tiumber <br />Sheet CO <br />Sheet Cl <br />Shcet C2 <br />Sheet C3 <br />Shat C4 <br />Sheet CS <br />Title <br />Cover Sheet <br />Site Preparation biap <br />Grading & Drainage Plan <br />Grading & Drainage !'lan <br />Grading & Drainage Plan <br />Cross Sections & Details <br />Technical Specifications <br />Division 1 - General Requirements <br />O I010 Sumrt�ary of Work <br />O1015 Change Order and Payment Forms <br />01025 Measurement and Payment <br />01030 Field Engineering <br />01060 Coordination <br />01300 Submittals <br />01400 Quality Convol <br />01500 Construction Facilities & Temporazy Controls <br />O1700 Contract Closeout <br />Division 2 - Site Work <br />02200 EazthW�ork <br />02273 Erosion Control <br />Lavout of the Work <br />� CON7'RACfOR shall be fully responsibk to layout the Work, including <br />construction staking, centerline staking, and other elements of the Work. This <br />shall generally require the services of a surveyor hired by the CONTRACTOR to <br />I establish control points for use during construction. The PORT will only provide <br />coordinates of !cnown teference monuments existing before commencnig Work an1 <br />will not provide staking or layout services to the CONCRACTOR. <br />11:11 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.