My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />UNION SLOUGH MARSH MTiTGATION <br />ix. <br />19. <br />� <br />Acceptance of Proposal (Nocice of Awardl <br />SECI'[ON 00800 <br />SUPPLEMENTARl' CONDITIONS <br />[n General Conditions, Articles 2.1 and 14.13, remove ttie time period "thirty (30)" <br />days and replace with "45 (forty-6ve) calendur days of the Bid Opening date." <br />Scheduling Document <br />Supplement paragraph 2.7 of the General Conditions with the following: <br />All submissions of schedule information to the ENG[NEER or the PORT shall be <br />provided in paper (hard copy) fomut and electronic forn�at. <br />Schedule of Values <br />Replace pazagraph 2.7.1 with the following: <br />2.7. l Within five (5) days after the effective dato of the Notice to Proceed and prior to <br />stan of work (unless otherwise specified in the Go.�eral Requirements), Contractor <br />shall submit to Engineer for review a preliminary schedule of the values of the <br />work. Each bid item shall be broken down to its basic elements. The cost <br />breakdown for both lump sum and unit price estimates shall include: <br />Labor <br />Materials <br />Equipment <br />Overhead, profit, and taxes <br />Otherfactors <br />Tirrie requaed <br />Add the new paragraph 2.7.2 as foilows: <br />2.7.2 Portions of this proja:� aze exempt from sales tax on labor in accordance with <br />Washington State law. The scheduk of values shall be formatted as indicated in <br />pazagraph 2.7.1 to sepazate these items clearly. Work specifically exempt from <br />sales tax on labor are as follow: <br />Excavation, stockpiling, transportation, dumping, grading, asphalt capping, <br />and costs associated with providing replacement materials for the soil <br />material considered to have elevated leveLs of azsenic located north of <br />Sta. 38+00. <br />Construction of the road, including demolition grading, pavement sec!ion, <br />curbs, sidewalks, and lendscaping. <br />00800-10 <br />,; <br />
The URL can be used to link to this page
Your browser does not support the video tag.