Laserfiche WebLink
1 <br />r <br />� <br />PORT OF EVERETT <br />UMON SLOUGH MARSH MITIGATION <br />SECTION OO8W <br />SUPPLEMENTARY CONDITIONS <br />Construction of the storm drainage system, including catch basins, piping, <br />lift stations, and trcatment ponds. <br />Constructian of the street Gghting system, including secondary wiring, <br />poles, and foundations. <br />Other work, such as water and sanitazy systemc, aze nut exempt &om sale� tax on <br />labor oven though they aze located in the street. <br />21. Use of Trainin� Center <br />The Training Center building will not be availabk for use by the Contractor. <br />END OF SECf[ON <br />