My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( PORT OF EVERETT <br />� UMON SLOUGH MARSH MITIGATION <br />SECfION 01030 <br />FIELD ENGINEERING <br />rosurveying, checking, corrcction of errors, roplecement of missing or damaged stakes, <br />and coordination effons. <br />Pi0.RT 2 - PRODUCTS <br />1 NOT USED <br />IPART 3 - EXECUTION <br />3.1 PROTECTION <br />A. <br />3.2 <br />A. <br />3.3 <br />Protect any flagging and stalcing providal by the PORT . Reference any control stalcing <br />and replace as necessary. <br />S[LT FENCE AND CLEARING LIMITS <br />Maintain : ny flagging providcd by the PORT and provide additional flagging as required <br />to readily deGneate limits and lines. <br />I I�1:7�1 <br />A. The CONTRACi'OR shall survey the benn and rolated slopes to determine where <br />settlement has occurnd. The survey shall be performed three months following the <br />completion of the grading work. The survey shall also include staldng of those areas <br />requiring placement of addidonal fill and gading. The survey woric shall include, but <br />not be limited to, the following: <br />1. Verify the berm elevations, grades, and cross secdons aze in accordance with the <br />plans. Cross secdons shall be taken at 50-foot intervals. The cross sections <br />include the berm and point where the new berm matches the oxisdng groend line. <br />The cross sections will be used to deternune addidonal fill volumes necessary to <br />bring the siu to grade following any settlement encountercd. <br />2. Provide alignment, grade, and slope staking for placement of addidonal fill as <br />required. <br />END OF SECI'ION <br />01030-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.