My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />PORT OF EVERETT <br />UNION SLOUGH MARSH MITiGATION <br />B. Hydroseeding: <br />2. <br />�a <br />Hydroseed azeas as specified on the Drawings. <br />Rate of apptication shall be a minimum of 44 Ibs/acre. <br />SECI'ION 02273 <br />TEIv�ORARY EROSION <br />CONTRO� <br />Apply fertilizer at l0 pounds per 1,100 syuare fat or equivalent. Fertiliur shall <br />be appGed in all areas of hydroseeding. <br />I3.2 PROTECI'fON <br />A. <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br />3.3 <br />Where possible, maintain natural vegetation for silt conuoL <br />Maintain all temporary facilities until conswction is completed or until potential for <br />erosion has passed. <br />Keep all off-site svats clean. <br />Prevent silt-laden water from leaving site. <br />Emissions from construction equipment must be rninurtized by using new or well <br />maintained equipment and by avoiding prolonged idling of equipment. <br />Construction noise must be mitigatec+ with properly sized and maintained mufflers, engine <br />intake silencers, engine enclosures, and turning off equipment when not in use. <br />Execute Work by methods to minimize raising dust from construction operations. <br />FTELD QUALITY CONTROL <br />A. All azeas of hydrosading shall be inspected prior to final project compktion. My azea of <br />spazse or bare coverage lazger than 2 by 2 fat shall be reseeded at no additional cost to <br />the PORT. <br />3.4 HAZARDOUS MATERIAL IMPLEMENTATION <br />' A. In the event that hazardous material is encountered during the course of the work, <br />� regazdless of whether or not the material is shown in the Plans, the irt�lementation of the <br />CONTRACTOR's SPCC Plan shall be included in the scope of the contract and shall be <br />carried out by the CONTRACfOR. <br />1 <br />02273-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.