Laserfiche WebLink
PORT OF EVERETT SECTION 02273 <br />UNiON SLOUGH MARSH MITIGATION TEN�ORARY EROSION <br />CONTROL <br />measures the CONfRACi OR shall take to provent the release or spread of the <br />following: <br />a. An on-site review has Ixen completed, and no sites or materials were <br />identi5ui or located. <br />b. Any hazardous matorial found on site and encountered during conswction <br />but not identified in contract documents. <br />c. My haza!dous materiaLs that the CONTRAC'fOR storos, uses, or <br />generates on the conswction site during conswetion activities. These <br />itertu include, but aze not limited ro, gasoline, oiLs and chemicals. <br />4. The SFti^.0 plan shall aLso address, at a minimum, the following project-specific <br />infotmation: <br />a. Introduction • <br />b. SPCC Plan Elements <br />c. Site Information <br />d. Management Approvat <br />e. Site Description <br />E F�anning and Recognicion <br />g. Spill Provention and Containment <br />h. Spill Response <br />i. Reporting <br />j. Program Management <br />k. Attachrrients: <br />(1) Emergency Action Plan <br />(2) Site Plan <br />(3) Inspe�tion and Incident Roport Forms <br />PART 3 - EXECUTION <br />3.1 EXAMINA7'ION <br />A. Verify limits of work aze flagged. <br />3.2 [NSTALLATI�N <br />A. Filter Fabric Fence: Install as shown on the Drawings. Periodically inspect the facilities <br />and maintain as specified. Inspect and repair as necessary the filter fabric fence within two <br />weeks of final completion. The filter fabric fence shall be left in place upon completion of <br />the project. <br />02273-4 <br />