My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />UNION SLOUGH MARSH MITIGATION <br />PORT OF EVEREI"f <br />THIS AGREEMENT is dated as of the day of <br />2(H10 by and between the Port of Everett (hereinafter called PORT) and <br />Section 00500 <br />Agreement Form <br />in the year <br />(hereinafter called CONTRACf'OR). <br />PORT and CONTRACi'OR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />:,RTICLF, 1 - WORK <br />The Project has been designeci by REID MIDDLETON, INC. <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Docwnents. The <br />Work is generally described as follows: <br />3urveying, erosion control, earthwork, grading for construction of berm and mush <br />mitigation azea. <br />ARTICLF, 2 - ENGINEF,R <br />The PORT has appointed Reid Middleton, lnc., as ENGINEER who shall be the PORT's <br />representative, assume all duties and responsibilities and have the rights and authority assigned to thc <br />HNGINEER in the Contract Documents in connection with completion of the Work in accordance <br />with the Contract Documents. <br />ARTICLE 3 - CON'1'RACT TIMN <br />3. I The Work shall be substantially complete on or before 210 cxlendar days after Notice to <br />Proceed. Final completion shall be on or before 30 calendaz days after substantial <br />completion. <br />3.2 Liyuidated Damages: PORT and CONTRACTOR recognize that tune is of the essence of <br />this Agreement and that PORT will suffer financial loss if the Work is not completed within <br />the times specified in paragraph 3.1 above, plus any extensions thereof allowed in <br />accordance with Article 12 of the General Conditions. They also recognize the delays, <br />expense and difficulties involved in proving in a legal or azbitration proceeding the acmal <br />loss suffered by PORT if the Work is not completed on tirne. Accordingly, insteaJ of <br />reyuiring any such proof, PORT and CONTRACTOR agree that as liquidated damages for <br />005(�-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.