My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECTION 00700 <br />UNION SLOUGH MARSH MITIGATION GEi 3RAL CONDi'i'IONS <br />ENG[NEER prompt written notice of any significant changes in the Work or deviations from the <br />Contract Documents cansed thereby. <br />Shop Draw�s and 3arr�les: <br />6.23 Aker checking and verifying all field nuasurements, CONTRACTOR �hall submit to <br />ENi,�NEER for review and approval, in accordance with the accepted schoduk of Shop Drawing <br />submissions (see pazagraph 2.9), five copies (unkss otherwiso speci5ed in the General Requirements) <br />of all Shop Drawings, which shall have been checked by and start�ped with the approval of <br />CONTRACTOR and identi5ed as ENGINEER may requ've. The data shown on the Shop Drawings <br />will be compkte with respect to dimensions, design criteria, materials of construction and lilce <br />information to enable ENGINEER to review the information as requ¢ed. <br />6.24 CON7'RACTOR shall, with such promptness as to cause no �.:lay in Work, submit to <br />ENGINEER for review and approval all samples requircd by the Contract Docurt►ents. All sart�ples <br />will have been checked by and stamped with the approval of CONPRACTOR, identi6ed cleazly as to <br />material, manufacturer, any peninent catalog numbers and the use for which intended. <br />6.25 At the time of each submission, CONTRACTOR shall in writing call ENGINEER's attention to <br />any deviations that the Shop Drawings or samples may have from the requ'vements of the Conaact <br />Documents. <br />6.26 ENGINEER wID review with reasonable pro�tness Shop Drawings and sart�ples but <br />ENGINEER's review and approval shall be only for conformance with the design concept of the <br />Project and for complianc;c with the information given in the Contract Documents and shall not <br />extend t� means, methods, sequences, techniques or procedures of construction or to safety <br />precautions or programs incident thereto. The review aud approvr,l of a separate item as such will <br />not indicate approval of the assembly in which the item funetions. CONTRACCOR shall malce any <br />corrections required by ENGINEER and shall return the roquired number of corncted copies of Shop <br />Drawings and resubmit new sartq�les for review and approval. CONTRACfOR shall d'vect specific <br />attention in writing to revisions other than the co�rections called for by ENGIWEER on provious <br />submittals. CONTRACfOR's start�p of approval on any Shop Drawing or sart�pk shall constitute a <br />representation to PORT and ENGINEER that CUNfRACfOR has either determined and verified all <br />quantities, dimensions, 5eld construction criteria. materials, catalog numbers, and si ��ilar data or <br />assumes full responsibility for doing so, and that CONTRACTOR has reviewed or coordinated each <br />3hop Drawing or sample with the requirements of the Work and the Contract Documents. <br />6.27 Where a Shop Drawing or sample is requircd by the Specifications, no related Work shall be <br />comnxnced until the submittal has been reviewed and approved by ENGINEER. <br />6.28 ENGINEER's review and approval of Shop Drawings or samples shall not relieve <br />CONTRACTOR from responsibility for any deviations from the Contract Documents unless <br />CONTRACTOR has in writing called ENGINEER's attention to such deviation at the time of <br />submission and ENGiNE�R has given written concurrence and approval to the speci5c deviation, nor <br />shall any concurrence or approval by ENGINEER relieve CQNTRACTOR from r-sponsibility for <br />errors or omissions in the Shop Drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.