My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECTION 00?00 <br />UMON SLOUGH MARSH MITIGATTON GENERAL CC�NDITIONS <br />14.7.4 PORT has been required to correct defective Work or cortyrlete the Work in accordance with <br />paragraph 13.13, <br />14.7.5 of CONTRACTOR's unsatisfactory prosecution of the Work in accordance with the Contract <br />G�ocuments, <br />1�.7.6 CONTRACTOR's failurc to make payrtent to Subcontractors, or for labor, materials or <br />equipment, or <br />14.7.7 of quantity adjustment or correction. <br />Substantial Completion• <br />14.8 When CONTRACTOR considers the entire Work rca�y for its intended use CONTRAC'I'OR <br />shall, in writinq to PORT and ENGINEER, certify that the entire Work is substantially cor►�lete and <br />request that ENGINEER issue a certi5cate of Substantial Cort�letion. Within a reasonabk time <br />thereafter, PORT, CONTRACTOR and ENGINEER shell malce an inspection of the Work to <br />determine the status of completion. If ENGINEER does not consider the Work substantially <br />complete, ENGINEER wID notify CONfRACTOR in writing giving his roasons therefor. If <br />ENGINEER considers the Work substantially corr�kte, ENGINEER will prepare and deliver to <br />PORT a tentative cert'il'icate of Substantial Compktion which sha115x the date of Substantial <br />Completion. Thero shall be attached to the cerci5cate a tentative list (punch list) of items to be <br />completed or corrected before final pa}mient. PORT shall have seven days after receipt of the <br />tentative certificate during which he may make written objection to ENGINEFR as to any provisions <br />of the certificate or attached list. If, after considering such objections, ENGINEER concludes that <br />the Work is not substantially cort�kte, ENGINEER will within fourteen days after subrtucsion of the <br />tentative certificate to PORT notify CONCRACi'OR in writing, stating his reasons therefor. If, after <br />consideration of PORT's objections, ENGINEER considers the Work substantially cort�kte, <br />ENGINEER will within said fourtan days execute and deliver to PORT and COIVT(tpCTOR a <br />defutitive certificate of Substantial Compktion (with a revised tentative list of items to be completed <br />or corrected) reflecting such changes [rom the tentative certificate as he believes justified after <br />consideration of any objections from PORT. At the time of delivery of the tentative certi5cate of <br />Substantial Co►r�ktion ENGINEER will delive� to PORT and CONTRACfOR a written <br />recommendation as to division of responsibilities pending finai payment betwan PORT and <br />CONTRACTOR with respect to security, operation, safety, rr�aintenance, heat, utilities and insurance. <br />Unless PORT and CONTRACTOR agree othenvise in writing and so inform ENGIIYEER prior to his <br />issuing the definitive certificate of Substantial Cort�letion ENGIIVEER's aforesaid recortm�endation <br />will be binding on PORT and CONTRACTOR until final payrnent. <br />14.9 PORT shall have the right to exclude CONTRACTOR from the Work after the date of <br />Substantial Completion, but PORT shall allow CONTRACTdR reasonable access to compkte or <br />correct items on the tentative list. <br />
The URL can be used to link to this page
Your browser does not support the video tag.