Laserfiche WebLink
PORT OF EVERETT <br />UNION SLOUGH MARSH MITIGAT[ON <br />',tf i�� <br />SECTION 00700 <br />GENERAL CONDIT[ONS <br />14.10 Use by PORT of compkted portions of the Work may be ac�omplished prior to Substantial <br />C�mpktion of all the Work subjcct to the foUowing: <br />14.10.1 PORT at any t'une may request Ct?IV7'RACfOR in writing to pertnit PORT to use any part <br />of the Work which PORT believes to be substantially compkte and which may be so used without <br />significant interhtence with construction of the other parts of the Work. ff CONTRAC'COR agrees, <br />CONTRACTOR wil! certify to PORT and ENGIIVEER that said part of the Work is substentially <br />compkte and request ENGiNEER to issue a arti5cate of Substantial Compktion for that part of the <br />Work. Within a reasonabk time thereafter PORT, CONCRACTOR and EN(3INEER shall rtnke an <br />inspection of that part of the Worlc to detemwro its status of eompktion. ff ENGIIVEER does not <br />consider that pa�t of the Work to be substantielly compkte, ENGINEER will notity PORT and <br />CON7'RACfOR in writing giving his reasons therefor. If ENaINEER consir�ers that part of the <br />Work to be substantially compkte, ENGINEER will execute and deliver to PORT and <br />CON7RACTOR a certificate to that effect, 5xing the date of Substantial Compktion as to that part <br />of the Work, attaching thento a tentadve list of iturtc to be compkted or cortxtcd before 5na1 <br />payment. Prior to issuing a arti5cate of Substantial Compktion as to part of the Work ENGINEER <br />will deliver to PORT und CONTRACI'OR a written recomrtiendation as to the division of <br />responsibilities pending final payment between PORT and CONTRACTOR with rospect to security, <br />operation, safiety, maintenance, utilities end insurance for that part of the Work which shall become <br />binding upon PORT and COIVTRACTOR at the tirt�e of issuing the de5nitive certi5cate of Substantial <br />Completion as to that part of the Work unkss PORT and CON'fRqCTOR shall have othecwise <br />agrad in writing and so inforned ENGINEER. PORT shall have the right ro exclude <br />CONTRACTOR from any part of the Work which EN(3INEER has so certi5ed to be substantially <br />complete, but PORT shall allow CONTRACCOR nasonabk aecess to compkte or correct items on <br />the tentative list. <br />14.10.2 In lieu of the issuance of a certi6cate of Substantial Cort4btion as to part of the Worlc, <br />PORT may take over operation of a facility constituting part of the Work whether or not it is <br />substantially comp.kte if such facility is functionally and sepazately usabk; provided that prior to any <br />such takeover, PORT and CONTRACTOR have agrad as ro the division of responsibilities between <br />PORT and CONTRACTOR for security, operation, safety, rt�aintenance, corrxaon period, heat, <br />utilities and insurance with respect te such facility. <br />00700-47 <br />