Laserfiche WebLink
'_2£PAZR-3PE�iFICATIONS AND LIST OP WORI( TO BE BID <br />Page �, � 5 <br />Address: zz08 State <br />NOTZCE TO CONTRACTORS: <br />There is no phone at the 2208 State house. The owner is <br />usually home mornings. If it is difficult to make inspections <br />in the mocning, contractors may contact Ruby Jones at 252-1122 <br />to make an appointment to view the home. <br />1. Roofing Tear off existing roofing complete to skip <br />sheathing on house and garage. Install new 1/2" C.C.X. <br />plywood over roofs. Install 15� asphalt impreqnated <br />£elt over plywood. Install anodized metal drip edge an <br />rakes and eaves. Replace facia on west side of house <br />and install new facia on other eaves of house_ Repair <br />bargeboard on north side of house near peak. Replace <br />materials in back porch roof complete. Replace all <br />rotted ;•offit boards and rafter tails. Install new 220# <br />fiberglass composition coofing on home and garage, 20 <br />year guarantee, in accordance with manufacturer's <br />installation instructions. Register date of application <br />with roofing manufacturer. Owner choice of roofing <br />color. <br />$ 3�(c0, <br />2. Gutters Remove existing gutters and downspouts <br />complete. install new aluminum 5" "R" style gutters and <br />matching downspouts on house. Gutters : secured 48" <br />O,C., slope to downspouts. Downspouts : secured at top, <br />bottom and all joints. P�ovide splashblocks at all <br />downspouts. Owner choice of color. Seal all joints in <br />gutters with an approved sealant. <br />,� 2 1 S - <br />:�. Exterior Paintin�c Power .wash existing siding on <br />house an garage. Scrape all loose and peeling paint <br />from siding and trim. (Do not prep or paint window sash <br />on house, new windows will be provided by separate <br />contractor under PUD Weatherization Program). Caulk all <br />joints between siding and trim. Prime all new and bare <br />wood with oil based primer. Paint entice house and <br />garaqe two coats oil base exterior paint, two colocs, <br />owner choice of color. <br />S �SOo ' <br />4. Site Work Remove existing wood fence material from <br />sitT Clean out and haul away debris inside qarage <br />after owner has had an opportunity to cull for valuables. <br />$ zoo - <br />Doors Replace front and rear exterior doors with new <br />pre-hung metal doors including new thresholds, magnetic <br />weatherstrinping, passage latch and long throw deadbolt <br />locks with matchina keys, Schlage or eaual. Install <br />peephole in each door. Material allowance for doo:s : <br />$170 each, Stanlef or equal. Paint dcors, both si9es, <br />oil base enamel, owner choice of color on each side. <br />� .SSo - <br />� <br />� <br />