My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2208 STATE ST 2016-01-01 MF Import
>
Address Records
>
STATE ST
>
2208
>
2208 STATE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 7:52:29 AM
Creation date
3/10/2017 12:26:41 AM
Metadata
Fields
Template:
Address Document
Street Name
STATE ST
Street Number
2208
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPAIR S?E��FIC?mIONS AVD LIST pP WORIC TO SE BZD <br />Address: zz08 S:ate <br />7. <br />Page 3 G�' � <br />Walls 6 Ceilinas Tear off west wall of interior of <br />house complete to studs. Notify Housing Improvement <br />Advisor if any rotted materials are revealed. Install <br />new fiberglass batt insulation in stud cavities, R-11, <br />foil or kraft face to warm side. Install new 1/2" <br />gypsum wallboard over wall. Tape and spackle for smooth <br />wall finish. <br />Patch holes and other defects in walls and ceilings <br />throughout. Clean existing walls and ceilings with <br />detergent approved for such use. Prime all new gypsum <br />wallboazd and patching plaster with latex primer. Paint <br />entire house walls, ceilings, and built-in cabinets, two <br />coats interior latex, owner choice of colors. Ritchen. <br />bathroom and cabinets shall use semi-gloss finish. All <br />other rooms to receive matte finish. Do nat paint wood <br />paneling in living room. <br />loS� - <br />Floors Tear out all floorinq surfaces throughout the <br />house �o sutiflooc. Notify Aousing Improvement Advisor <br />if any rotted subfloor materials are revealed. <br />Install new 1/2" underlayment grade plywood on bathroom <br />floor. Invtall 1/2" particle board in kitchen and <br />pantry area. Install new resilient vinyl shee"_ goods <br />over kitchen, pantry and bathroom floors. Material <br />ailowance for vinyl flooring :$12 per sq, yd. retail. <br />Install new pre-finished wood base at permimeter of <br />vinyl flooring. 5ea1 all seams in flooring. Owner <br />choice of style and color of vinyl. <br />inatall 3/8" rebond carpet pad in living room and both <br />bedrooms, includinq cloaets. Install new carpet, S12 <br />per sq. yd. material allowance retail, owner choice of <br />style and color. Install manufacturer's approved <br />tackstrips and use metal edge bars at all changes of <br />material. <br />lb�o - <br />B. Cabinets 8 Counterto s Remove existing countertop <br />rom k tchen cabinets. install new 3/4" particle board <br />counter underlay. Install new high pressure plastic <br />laminate over counters and front edge. Use <br />manufacturer's approved metal edge stzips. Owner choice <br />of laminate color. install owner's white laminate <br />surfaced hardboacd on backsplash up to wali cabinets. <br />Fabcicate and install new doors for vanity base cabinet <br />in bathcoom. Ease outside edge, rout out inside edge <br />and provide new knobs and hinges. Prep Por �aint. <br />'-/ � a — <br />� <br />� <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.