My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2712 SUMMIT AVE 2016-01-01 MF Import
>
Address Records
>
SUMMIT AVE
>
2712
>
2712 SUMMIT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 9:27:22 PM
Creation date
3/10/2017 1:23:42 AM
Metadata
Fields
Template:
Address Document
Street Name
SUMMIT AVE
Street Number
2712
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July I5, 2003 <br />� <br />puecic wo�Ks <br />ENGINEERING / PUBL/C SERVICE8 DEPARTMENT <br />Melvin Boggess <br />4930 Glenwood Avenue <br />Everett, WA 98203 <br />RE: Owner: <br />Iob Address: <br />Plan Ch;ck No.: <br />Dear Mr. Boggess: <br />Boggess <br />2712 Summi! Avenue <br />C0307-008 <br />Everett <br />� <br />�����i <br />2002 <br />In response to your application for a construction permit, your plans have been examined and <br />you are advised that the issuance of a permit is being withheld for the reasons listed below. <br />These comments address building issues only. Additional revisions or additions may be required <br />by other departments (such as Utilities, Planning or Fire). All references refer to the 1997 <br />Uniform Building Code, as amended by the State of Washington and/or Washington State <br />Energy Code 2001 Edition, unless stated othenvise. <br />In order for the processin of your a�plication to continue, it will be necessary <br />to provide the Building �ivision w�th two cumplete new sets of drawings <br />retTecting the corrections requested. <br />Plans as drawn do not pro��ide sufficient information to complete plan review. <br />Provide the following infortnation in plan seC <br />a. <br />b. <br />c. <br />Foundation plan <br />Site plan <br />Cross sec[ions <br />All plans shall have sufficient detail to show compliance �vith the Uniform <br />Building Code (UBC). <br />2. Sho�v on plans all new construction. Use different symbols to represent new and <br />existing construction. <br />3. Provide attic ventilation calculations. Show required ventilation on plans. <br />4. New construction is required to have Zx6 construction with R-21 insulation. <br />5. Provide construcrion drawings and details for exterior decks and/or porches. <br />Show handrail and guardrail requirements. <br />CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 •(425) 257-8200 • Fax (425) 257-8856 1/Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.