Laserfiche WebLink
(II) ALTERNATE BID ITEMS: <br />(A) Add the cost of providing the North upper floor <br />level restrooms: With mechanical, and electrical <br />(similar to south upper level electrical) included. <br />Finishes are similar to south area restrooms. <br />in words $ <br />in figures $ <br />(B) Add ( ), subtract ( ) the cost of providing carpet <br />in place of Vinyl Composition Tile (VCT) at the <br />south ground floor level (except restrooms) per the <br />finish schedule. <br />in words $ <br />in figures <br />(C) Add ( ), subtract ( ) the cost of providing VCT <br />in place of carpet at the south upper floor leve.l <br />per finish schedule. <br />in words $ <br />in figures $ <br />(D) Add the cost of providing Accoustic wall per detail <br />3/1 at the north upper floor area. <br />in words $ <br />in figures $ <br />(E) Add ( ), subtract the cost of providing matching <br />Heat Pumps in place of air conditioners per sheet <br />M-1 note. <br />in words <br />in figures $ <br />(11I) UNIT COST ITEMS: <br />(A) For addition of 2 inch thick, 1 pound density, <br />accoustical insulation (Johns Manville - Microlite) <br />at the suspended ceiling areas. Per sq/ft. per 2 - <br />inch layer, cut to 2'x 4' ceiling panel size. <br />F9 <br />wcb/spec POE -BID 6-92 <br />2 <br />