Laserfiche WebLink
35. Conti¢uous acceas �uet be provided to the two sewer mains oa site in <br /> the form of 12 foot Wide corridor running the length of the lines. <br /> 36. A field vibration measurement program must be imple�ented ae the start <br /> of each phase of construction to confirm eatimated cibration amplitudes <br /> and make ad�uatmenta ta insure that no off-aite property damage occurs. <br /> 37. Conatruction or aubstantial progresa toward construction of a project <br /> must be undertaken within 2 yeara after final approval of ehe permit, <br /> and completed withia 5 yeara. If the pro,�ect has no[ been campleted in <br /> thie t7me epan, the permit vill he reviewed by the Planning Department <br /> � who vill do one of the following: <br /> - extend the permit for one year, or <br /> - terminatc the permit <br /> 38. mainteaance dredging must be conducted ia 1989 at the ezisting Jetty <br /> Island dock to provide low tide access for [he Jetty Island Days ferry <br /> boat. <br /> 02085 <br /> -7- <br />