My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3500 TERMINAL AVE 2018-01-02 MF Import
>
Address Records
>
TERMINAL AVE
>
3500
>
3500 TERMINAL AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 9:47:00 AM
Creation date
3/10/2017 3:32:13 AM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
3500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35. Conti¢uous acceas �uet be provided to the two sewer mains oa site in <br /> the form of 12 foot Wide corridor running the length of the lines. <br /> 36. A field vibration measurement program must be imple�ented ae the start <br /> of each phase of construction to confirm eatimated cibration amplitudes <br /> and make ad�uatmenta ta insure that no off-aite property damage occurs. <br /> 37. Conatruction or aubstantial progresa toward construction of a project <br /> must be undertaken within 2 yeara after final approval of ehe permit, <br /> and completed withia 5 yeara. If the pro,�ect has no[ been campleted in <br /> thie t7me epan, the permit vill he reviewed by the Planning Department <br /> � who vill do one of the following: <br /> - extend the permit for one year, or <br /> - terminatc the permit <br /> 38. mainteaance dredging must be conducted ia 1989 at the ezisting Jetty <br /> Island dock to provide low tide access for [he Jetty Island Days ferry <br /> boat. <br /> 02085 <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.