My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST ARTS AND SCIENCES BLDG 2018-01-02 MF Import
>
Address Records
>
TOWER ST
>
2000
>
ARTS AND SCIENCES BLDG
>
2000 TOWER ST ARTS AND SCIENCES BLDG 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 11:01:19 AM
Creation date
3/10/2017 5:20:51 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
ARTS AND SCIENCES BLDG
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
show such arrangement in our design of the first level. As much as I would <br />like to see the cost of construction go down, I suppose putting an exterior <br />door on the North face of the building is not something we had anticipated. <br />Thanks, please let us know if you have questions/comments. <br />John <br />-----Original Message ----- <br />From: Steve Godes [mailto:sgodes@mka.com] <br />Sent: Friday, September 30, 2005 9:49 AM <br />To: John Lim <br />Subject: RE: EvCC ASS <br />Paul stated that the Fire Marshal was involved in this discussion and had no <br />objections to deleting the valve. If you want to hear it directly from <br />PLul, I've attached his contact info here. <br />-----Original Message ----- <br />From: John Lim (mailto:JLim@LMNArchitects.com) <br />Sent: Friday, September 30, �.005 9:44 AM <br />To: Steve Godes <br />Subject: RE: EvCC ASS <br />Steve, <br />I appreciate the fact that the comment came from the city reviewer. We just <br />want to make sure that the fire marshal does not show up at the end of the <br />job and tell us to reinstall it. Do you think it is a good idea to talk to <br />the fire marshal to get his explicit approval? <br />By the way, this is going to be ASI 004. <br />John <br />-----Original Message ----- <br />From: Steve Godes (mailto:sgodes@mka.com] <br />Sent: Friday, September 30, 2005 8:22 AM <br />To: John Lim <br />Subject: RE: EvCC ASS <br />John, <br />Paul McKee, the City reviewer, is the one who called me yesterday to say we <br />could delete it. He told me that because they have good access to the riser <br />room in the building, they actually prefer this configuration. Paul also <br />mentioned that he had been speaking to Interwest about this issue and that <br />they were aware of the requested change. <br />Steve <br />-----Original Message ----- <br />From: John Lim [mailto:JLim@LMNArchitects.com] <br />Sent: Friday, September 30, 2005 8:17 AM <br />To: Steve Godes <br />Subject: RE: EvCC ASS <br />Steve, <br />I brought this up in yesterday's construction meeting, and I couldn't quite <br />recall if you told me that you had also checked with the fire marshal. Other <br />participants in the meeting seemed a little incredulous that we can get away <br />without it. <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.