Utility Trenches <br />Trench e•cavation, pipe bedding, and trench backfilling should be completed using the general <br />procedures described in the 2004 WSDOT Standard Specifications or other suitable procedures specified <br />by the project civil engineer. The native glacial deposits and fill soils encountered at the site are generally <br />of low corrosivity based on our experience in the Puget Sound area. <br />Utility trench backfill should consist of structural fill and should be placed in lifts of 8 inches or less <br />(loose thickness) such that adequate compaction can be achieved throughout the lift. Sand backfill, <br />containing less than 5 percent fines, may be compacted in loose lifts not exceeding 12 inches when placed <br />below five feet of the finished ground surface. Each lift must be compacted prior to placing the <br />subsequent lift. Prier to compaction, the backfill should be moisture conditioned to within 3 percent of <br />the optimum moisture content, if necessary. The backfill should be compacted in accordance with the <br />criteria discussed above. Figure 4 illustrates recommended trench compaction criteria under pavement <br />and non-structural areas. <br />Sedimentation and Erosion Control <br />In our opinion, the erosion potential of the on -site soils is low to moderate. Construction activities <br />including stripping and grading will expose soils to the erosional effects of wind and water. The amount <br />and potential impacts of erosion are partly related to the time of year that construction actually occurs. <br />Wet weather construction will increase the amount and extent of erosion and potential sedimentation. <br />lirosion and sedimentation control measures may be implemented by using a combination of <br />inlercepior swales, straw bale barriers, silt fences and straw mulch for temporary erosion protection of <br />exposed soils. All disturbed areas should be finish graded and seeded as soon as practicable to reduce the <br />risk of erosion. Erosion and sedimentation control measures should be installed and maintained in <br />accordance with the requirements of the City of Everett. <br />EXCAVATIONS <br />Excavations for the first floor level will require cuts up to about 10 feet deep in the southwest area. <br />Cuts up to 4 feet will also be needed for the southwest portion of the second level. These cuts can likely <br />be made as temporary open cut slopes depending on site constraints. Excavations are also required for <br />underground utilities. The stability of open cut slopes is a function of soil type, groundwater seepage, <br />slope inclination, slope height and nearby surface loads. The use of inadequately designed open cuts <br />could impact the stability of adjacent work areas, existing utilities, and endanger personnel. <br />The contractor performing the work has the primary responsibility for protection of workmen and <br />adjacent improvements. In our opinion, the contractor will be in the best position to observe subsurface <br />conditions continuously throughout the construction process : nd to respond to variable soil and <br />groundwater conditions. Therefore, the contractor should have the primary responsibility for deciding <br />whether or not to use open cut slopes for much of the excavations rather than some form of temporary <br />cxcatation support, and for establishing the safe inclination of the cut slope. Acceptable slope <br />inclinations for utilities and ancillary excavations should be determined during construction. Because of <br />the diversity of construction techniques and available shoring systems, the design of temporary shoring is <br />most appropriately left up to the contractor proposing to complete the installation. Temporary cut slopes <br />(D <br />G c o E n g i n c c r s 10 File No. 5836-002-001040204 <br />