My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST ARTS AND SCIENCES BLDG 2018-01-02 MF Import
>
Address Records
>
TOWER ST
>
2000
>
ARTS AND SCIENCES BLDG
>
2000 TOWER ST ARTS AND SCIENCES BLDG 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 11:01:19 AM
Creation date
3/10/2017 5:20:51 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
ARTS AND SCIENCES BLDG
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utility Trenches <br />Trench eā¢cavation, pipe bedding, and trench backfilling should be completed using the general <br />procedures described in the 2004 WSDOT Standard Specifications or other suitable procedures specified <br />by the project civil engineer. The native glacial deposits and fill soils encountered at the site are generally <br />of low corrosivity based on our experience in the Puget Sound area. <br />Utility trench backfill should consist of structural fill and should be placed in lifts of 8 inches or less <br />(loose thickness) such that adequate compaction can be achieved throughout the lift. Sand backfill, <br />containing less than 5 percent fines, may be compacted in loose lifts not exceeding 12 inches when placed <br />below five feet of the finished ground surface. Each lift must be compacted prior to placing the <br />subsequent lift. Prier to compaction, the backfill should be moisture conditioned to within 3 percent of <br />the optimum moisture content, if necessary. The backfill should be compacted in accordance with the <br />criteria discussed above. Figure 4 illustrates recommended trench compaction criteria under pavement <br />and non-structural areas. <br />Sedimentation and Erosion Control <br />In our opinion, the erosion potential of the on -site soils is low to moderate. Construction activities <br />including stripping and grading will expose soils to the erosional effects of wind and water. The amount <br />and potential impacts of erosion are partly related to the time of year that construction actually occurs. <br />Wet weather construction will increase the amount and extent of erosion and potential sedimentation. <br />lirosion and sedimentation control measures may be implemented by using a combination of <br />inlercepior swales, straw bale barriers, silt fences and straw mulch for temporary erosion protection of <br />exposed soils. All disturbed areas should be finish graded and seeded as soon as practicable to reduce the <br />risk of erosion. Erosion and sedimentation control measures should be installed and maintained in <br />accordance with the requirements of the City of Everett. <br />EXCAVATIONS <br />Excavations for the first floor level will require cuts up to about 10 feet deep in the southwest area. <br />Cuts up to 4 feet will also be needed for the southwest portion of the second level. These cuts can likely <br />be made as temporary open cut slopes depending on site constraints. Excavations are also required for <br />underground utilities. The stability of open cut slopes is a function of soil type, groundwater seepage, <br />slope inclination, slope height and nearby surface loads. The use of inadequately designed open cuts <br />could impact the stability of adjacent work areas, existing utilities, and endanger personnel. <br />The contractor performing the work has the primary responsibility for protection of workmen and <br />adjacent improvements. In our opinion, the contractor will be in the best position to observe subsurface <br />conditions continuously throughout the construction process : nd to respond to variable soil and <br />groundwater conditions. Therefore, the contractor should have the primary responsibility for deciding <br />whether or not to use open cut slopes for much of the excavations rather than some form of temporary <br />cxcatation support, and for establishing the safe inclination of the cut slope. Acceptable slope <br />inclinations for utilities and ancillary excavations should be determined during construction. Because of <br />the diversity of construction techniques and available shoring systems, the design of temporary shoring is <br />most appropriately left up to the contractor proposing to complete the installation. Temporary cut slopes <br />(D <br />G c o E n g i n c c r s 10 File No. 5836-002-001040204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.