Laserfiche WebLink
6. If a rearrangement of existing �ables on premises or on the right-oF-way is necessary, <br /> appropriate charges will be estimated and Verizon's Guaranty oi Payment form will be <br /> fonvarded to you for your signature. Prior lo commencement of Verizon's e�gineering for <br /> such rearrangement, a deposit will be required. To insure timely telephone service, <br /> Verizon reyuests ninety (90) days lead time for engineering, procurement, and installation <br /> o(cable and/or Verizon's equipment. <br /> Please contacl Michael HupF, Engineering, at (425) 356-�'052 or Mike Bly, Engineer at <br /> (425) 356-4034 should you require additional informa�ion. <br /> 5:\FSiddiqlWINWORD\SEPNU7-01u"College Phasc Il.doc <br /> Il � <br /> �3 <br />