Laserfiche WebLink
Call (n25) 257-8125 f�r more information. <br /> 13. Con.truction and demolition of buildings shall be in compliance with the provisions of the <br /> 2003 Inlernalional Fire Codr_, Chapter 14. <br /> 14. Permits are required irom the Fire Department for removal and installation of <br /> underground fuel tanks. <br /> 15. AII fire alarm conlrol panels (FACP) and sprinkler vaives shal' F,e in heated rooms or <br /> closets with standard man door:ccess. Locations shall be approved by lhe Fire Marshal's <br /> O(fice. <br /> GENERAL INFORMATION <br /> 1. Pu�et Sound Energy is the nalural gas provider in this area. To initiate new service <br /> orders, please contact Ma�ilyn Davis Westlund at (425) 356-7512 at least 90 days prior to <br /> the requi�ed in-service date. <br /> Any relocation M existing gas faciiities for this devc�opment will be at the developer's sole <br /> expense, and rey�iires 90 days minimum notice. Please contact Elaine Babby at (206) <br /> 224-2018 to coordinate relocaGon requesls. <br /> 2. The Snohomish Counly PUD currently has su�fcient capaci;y to serve tiie propcsed <br /> de�aelopment. For further information about '.ne eleclrical service requiremenls (cr this <br /> project, please call Kurt Martin of the DislricCs Customer Engineering Of(ice, Everett at <br /> 258-8?_91. <br /> 3. Verizon Northwesl has facililies near ihis locat�en. However, any building �ntrances rnust <br /> be coordinated at Ieast GO days in advance. The cost of any relocation of Verizon facilities <br /> that is required to construct thr, new apartments will be at the lotal expense of the <br /> developer. Any reloca;ion will lake 60 to 120 days. Please coNact Mike I lupf, Engineer at <br /> (425) 356-4052 or A4ike Bly, Engineer at (425) 356-4034 if you have rny questions <br /> regarding this building entrance. <br /> 4. Verizon Northwest will provide service to lhe site. However, new telephone cable <br /> conslruction will be required in conjunclion with the sitc developmenL Verizon's <br /> engineeriny will begin when they are nolified of your construction schedules and telephone <br /> requiremecls. <br /> 5. It will be the developer's responsibility to provide a suitable combina;ion of conduit and <br /> trenching and/or riser conduit to accommodate Verizon's network communications cable <br /> within the c,omplex. Provided thal an acceplable combination o( conduit and/or trenching <br /> is incorporated into the project to accommodale Verizon's ^ntrance cable, lhere will be no <br /> costs to the developer for Verizon's cable. <br /> io Z <br /> l� <br />