My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/06/20 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/06/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 11:14:44 AM
Creation date
3/10/2017 11:14:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit J 3 <br /> Alleged Consultant Design Error Procedures <br /> The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is <br /> of a nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for <br /> the resolution and/or cost recovery procedures in those instances where the agency believes is has <br /> suffered some material damage due to the alleged error by the consultant. <br /> Step 1 —Potential Consultant Design Error(s) is Identified by Agency's Project Manager <br /> At the first indication of potential consultant design error(s),the first step in the process is <br /> for the Agency's project manager to notify the Director of Public Works or Agency <br /> Engineer regarding the potential design error(s). For federally funded projects,the Region <br /> Highways and Local Programs Engineer should be informed and involved in these <br /> procedures. (Note: The Director of Public Works or Agency Engineer may appoint an <br /> agency staff person other than the project manager,who has not been as directly involved <br /> in the project,to be responsible for the remaining steps in these procedures.) <br /> Step 2—Project Manager Documents the Alleged Design Error(s) <br /> After discussion of the alleged design error(s)and the magnitude of the alleged error(s), <br /> and with the Director of Public Works or Agency Engineer's concurrence,the project <br /> manager obtains more detailed documentation than is normally required on the project. <br /> Examples include: all decisions and descriptions of work; photographs,records of labor, <br /> materials and equipment. <br /> Step 3—Contact the Consultant Regarding the Alleged Design Error(s) <br /> If it is determined that there is a need to proceed further,the next step in the process is for <br /> the project manager to contact the consultant regarding the alleged design error(s)and the <br /> magnitude of the alleged error(s). The project manager and other appropriate agency staff <br /> should represent the agency and the consultant should be represented by their project <br /> manager and any personnel(including sub-consultants)deemed appropriate for the alleged <br /> design error(s) issue. <br /> Step 4—Attempt to Resolve Alleged Design Error with Consultant <br /> After the meeting(s) with the consultant have been completed regarding the consultant's <br /> alleged design error(s),there are three possible scenarios: <br /> • It is determined via mutual agreement that there is not a consultant design <br /> error(s). If this is the case,then the process will not proceed beyond this point. <br /> • It is determined via mutual agreement that a consultant design error(s)occurred. <br /> If this is the case,then the Director of Public Works or Agency Engineer, or their <br /> representatives,negotiate a settlement with the consultant. The settlement would <br /> be paid to the agency for the services on the project in which the design error <br /> took place. The agency is to provide H&LP,through the Region Local Programs <br /> Engineer, a summary of the settlement for review and to make adjustments, if <br /> 135 <br /> DOT Form 140-089 EF Page 32 <br /> Revised 6/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.