My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/06/20 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/06/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 11:14:44 AM
Creation date
3/10/2017 11:14:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: 6 <br /> Clearwell No. 2—Amendment X Consent COUNCIL BILL# <br /> No. 1 to the Professional Action Originating Department PW-Utilities <br /> Services Agreement with First Reading Contact Person John McClellan <br /> Carollo Engineers for Second Reading Phone Number 257-8201 <br /> Additional Design and Third Reading FOR AGENDA OF <br /> Construction Services Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Filtration Plant Professional Services Contract Amendment PW-Utilities <br /> Agreement <br /> Amount Budgeted $25,000,000 <br /> Expenditure Required $991,000 Account Number(s): UP-3198-1 <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> The original contract with Carollo, signed on November 15t, 2004, provided for preliminary design,final <br /> design, and contract documents for the proposed second clearwell at the Water Filtration Plant;the original <br /> contract amount was for$688,647. Poor soil conditions were encountered during the preliminary design <br /> phase,which required additional design effort. During the design phase, it was determined advantageous to <br /> include the redesign of the existing backwash pump station as well other elements not included in the <br /> original scope. It was decided during the original scoping to not include scope and fee for construction <br /> period services, as it was not known at that early stage what the design solution would require during <br /> construction. Therefore, scope and fee for services during the construction period are included with this <br /> amendment also. The new contract amount will be$1,679,647. <br /> The new 6.7 million gallon clearwell will add system redundancy, operational flexibility, and contribute to <br /> increased plant capacity to allow for increased system demand. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Mayor to sign Amendment No. 1 to the Professional Services Agreement with Carollo Engineers <br /> for additional design and construction services at the Water Filter Plant for the sum of$991,000.00 <br /> 411 <br /> C.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.