My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/06/20 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/06/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 11:14:44 AM
Creation date
3/10/2017 11:14:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> DESIGN PHASE FEE INCREASE REQUEST <br /> The additional fee increase request is for a total of$309,583, broken down as follows: <br /> Carollo Engineers <br /> Clearwell No. 2, Additional Design Services <br /> City of Everett <br /> Firm/Staff Position Hours Total <br /> CAROLLO ENGINEERS <br /> Project Manager 210 <br /> Project Engineer 795 <br /> CAD Designer 625 <br /> Subtotal, incl. expenses $235,500 <br /> TETRA TECH/KCM <br /> Project Manager 42 <br /> Electrical/Controls Engineer 132 <br /> CAD Designer 72 <br /> Subtotal, incl. expenses $28,000 <br /> SHANNON & WILSON' <br /> Subtotal, incl. expenses $26,500 <br /> ENVIROCON CONSULTING2 <br /> Subtotal, incl. expenses $20,000 <br /> TOTAL $310,000 <br /> Notes: <br /> 1) Includes Cone Penetration Testing, geotechnical specification preparation, and Contract <br /> Document review. <br /> 2) Includes architectural services. <br /> ENGINEERING SERVICES DURING CONSTRUCTION <br /> The following scope of work is submitted for the construction period. <br /> . 28 <br /> H:\Client\Everett_SEA\Contracts\7094A10-Clearwell dgdn\Amend 1 Apr 2007\EXHIBIT A.doc A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.