My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/06/20 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/06/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 11:14:44 AM
Creation date
3/10/2017 11:14:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. 84" Flow Meters <br /> 9. Alarms <br /> PLC programming - Provide ladder logic programming as required to map all field points to <br /> memory registers and enable communications between the existing Plant PLC and the new <br /> RTU's. Provide ladder logic required to execute system functions. Provide Ladder logic <br /> programming for all unique RTU configurations. <br /> PLC programming is based on the I/O count provided in the contract documents (2 PLCs, 23 <br /> analog I/O and 37 discrete I/O). <br /> 7.5.2 Factory Testing <br /> Setup SCADA equipment and test all control functions, display, alarm, and PLC I/O, control and <br /> programming. Test SCADA, PLCs, and communications equipment for end to end data <br /> transmission integrity and accuracy. Test all SCADA screens, including HMI (Panel View) <br /> screens, data monitor screens, and trend screens, for connectivity, completeness, and accuracy <br /> of information displayed.Test SCADA control, alarm, navigation, and security configurations <br /> and functions. Test trend screen functions. <br /> Test SCADA communications, RTU, and communications equipment for end-to-end data <br /> connectivity, integrity, and accuracy. Verify the configuration of all fiber modems. <br /> Verify the I/O wiring and functionality of all RTUs, Load PLC programs and test functionality. <br /> Integrate the entire system in the contractors shop and test end-to-end data communications <br /> integrity and accuracy over dry pair wiring. <br /> 7.6 Review Progress Payment Requests <br /> City staff will provide review on all Contractors' requests for progress payments for the project. <br /> The Engineer shall provide additional review at the request of the City. <br /> 7.7 Monitor Testing <br /> City staff shall coordinate and monitor testing performed during the project(e.g., compaction <br /> tests, concrete cylinder tests, pump tests, and pipeline tests)to ensure compliance with the <br /> Contract Documents. At the request of the City, the Engineer shall provide additional review, <br /> test data interpretation, and other similar support as needed. <br /> 7.8 Construction Meetings and Reports <br /> Attend biweekly construction meetings with the City staff and the Contractor to review project <br /> progress. City staff will establish agenda, preside over meeting, and prepare summary reports. <br /> 3i <br /> H\Client\Everett_SEA\Contracts17094A10-Clearwell dgdn\Amend 1 Apr 20071EXHIBIT A.doc A-7 <br />