My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> The costs for power, gas, labor, material, supplies, and everything else needed to <br /> successfully complete operational testing, shall be included in the unit contract prices <br /> related to the system being tested, unless specifically set forth otherwise in the proposal. <br /> Operational and test periods, when required by the Engineer, shall not affect a <br /> manufacturer's guaranties or warranties furnished under the terms of the contract. <br /> 1-05.13.RTF <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor I <br /> (August 14, 2013 APWA GSP) <br /> Delete the sixth and seventh paragraphs of this section. 1 <br /> 1-0515.RTF <br /> 1-05.15 Method of Serving Notices <br /> (March 25, 2009 APWA GSP) <br /> Revise the second paragraph to read: <br /> 111 <br /> All correspondence from the Contractor shall be directed to the Project Engineer. AM <br /> correspondence from the Contractor constituting any notification, notice of protest, notice <br /> of dispute, or other correspondence constituting notification required to be furnished <br /> under the Contract, must be in paper format, hand delivered or sent via mail delivery <br /> service to the Project Engineer's office. Electronic copies such as e-mails or <br /> electronically delivered copies of correspondence will not constitute such notice and will <br /> not comply with the requirements of the Contract. <br /> 1-0516.RTF <br /> Add the following new section: <br /> 1-05.16 Water and Power <br /> (October 1, 2005 APWA GSP) <br /> The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> and water necessary for the performance of the work, unless the contract includes <br /> power and water as a pay item. <br /> 1-06.GR1 <br /> Control of Material <br /> 1-06,INSTLGR1 <br /> Section 1-06 is supplemented with the following: <br /> 1-06.OPT1.GR1 <br /> Buy America <br /> 1-06.OPT1(A).GR1 <br /> (August 6, 2012) <br /> In accordance with Buy America requirements contained in 23 CFR 635.410, the major <br /> quantities of steel and iron construction material that is permanently incorporated into <br /> CITYWIDE INTERSECTION SIGNING ®� <br /> FED AID#HSIP-000S(439); COE#3628 18 November 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.