Laserfiche WebLink
1 1 INTRO.AP1 <br /> ' 2 INTRODUCTION <br /> 3 The following Amendments and Special Provisions shall be used in conjunction with the <br /> ' 4 2016 Standard Specifications for Road, Bridge, and Municipal Construction. <br /> 5 <br /> 6 AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> 1 7 <br /> 8 The following Amendments to the Standard Specifications are made a part of this contract <br /> 9 and supersede any conflicting provisions of the Standard Specifications. For informational <br /> 10 purposes, the date following each Amendment title indicates the implementation date of the <br /> 11 Amendment or the latest date of revision. <br /> 12 <br /> 13 Each Amendment contains all current revisions to the applicable section of the Standard <br /> ' 14 Specifications and may include references which do not apply to this particular project. <br /> 15 <br /> 16 1-01.AP1 <br /> 17 Section 1-01, Definitions and Terms <br /> 18 August 1, 2016 <br /> 19 1-01.3 Definitions <br /> 20 The following new term and definition is inserted after the eighth paragraph: <br /> 1 21 <br /> 22 Cold Weather Protection Period —A period of time 7 days from the day of concrete <br /> 23 placement or the duration of the cure period, whichever is longer. <br /> 24 <br /> i 25 1-02.AP1 <br /> 26 Section 1-02, Bid Procedures and Conditions <br /> 27 April 4, 2016 <br /> 28 1-02.4(1) General <br /> 29 The first sentence of the last paragraph is revised to read: <br /> 30 <br /> ' 31 Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, <br /> 32 shall request the explanation or interpretation in writing by close of business on the <br /> 33 Thursday preceding the bid opening to allow a written reply to reach all prospective <br /> 34 Bidders before the submission of their Bids. <br /> ' 35 <br /> 36 1-02.9 Delivery of Proposal <br /> 37 The last sentence of the third paragraph is revised to read: <br /> 38 <br /> 39 The Contracting Agency will not open or consider any Proposal when the Proposal or <br /> 40 Bid deposit is received after the time specified for receipt of Proposals or received in a <br /> 41 location other than that specified for receipt of Proposals unless an emergency or <br /> 42 unanticipated event interrupts normal work processes of the Contracting Agency so that <br /> 43 Proposals cannot be received. <br /> 44 <br /> 45 The following new paragraph is inserted before the last paragraph: <br /> 46 <br /> I <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/16 <br />