My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 If an emergency or unanticipated event interrupts normal work processes of the <br /> 2 Contracting Agency so that Proposals cannot be received at the office designated for <br /> 3 receipt of bids as specified in Section 1-02.12 the time specified for receipt of the <br /> 4 Proposal will be deemed to be extended to the same time of day specified in the <br /> 5 solicitation on the first work day on which the normal work processes of the Contracting <br /> 6 Agency resume. <br /> 7 <br /> 8 1-02.12 Public Opening of Proposals <br /> 9 This section is supplemented with the following new paragraph: <br /> 10 <br /> 11 If an emergency or unanticipated event interrupts normal work processes of the <br /> 12 Contracting Agency so that Proposals cannot be opened at the time indicated in the call <br /> 13 for Bids the time specified for opening of Proposals will be deemed to be extended to <br /> 14 the same time of day on the first work day on which the normal work processes of the <br /> 15 Contracting Agency resume. <br /> 1 <br /> 16 <br /> 17 1-04.AP1 <br /> 18 Section 1-04, Scope of the Work 1 <br /> 19 August 1, 2016 <br /> 20 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, , <br /> 21 Specifications, and Addenda <br /> 22 The following new paragraph is inserted before the second to last paragraph: <br /> 23 <br /> 24 Whenever reference is made in these Specifications or the Special Provisions to codes, <br /> 25 rules, specifications, and standards, the reference shall be construed to mean the code, <br /> 26 rule, specification, or standard that is in effect on the Bid advertisement date, unless <br /> 27 otherwise stated or as required by law. <br /> 28 <br /> 29 1-06.AP1 I <br /> 30 Section 1-06, Control of Material <br /> 31 January 4, 2016 1 <br /> 32 This section is supplemented with the following new section and subsections: <br /> 33 <br /> 34 1-06.6 Recycled Materials <br /> 35 The Contractor shall make their best effort to utilize recycled materials in the <br /> 36 construction of the project; the use of recycled concrete aggregate as specified in <br /> 37 Section 1-06.6(1)A is a requirement of the Contract. <br /> 38 <br /> 39 The Contractor shall submit a Recycled Material Utilization Plan as a Type 1 Working <br /> 40 Drawing within 30 calendar days after the Contract is executed. The plan shall provide <br /> 41 the Contractor's anticipated usage of recycled materials for meeting the requirements of <br /> 42 these Specifications. The quantity of recycled materials will be provided in tons and as <br /> 43 a percentage of the Plan quantity for each material listed in Section 9-03.21(1)E Table <br /> 44 on Maximum Allowable Percent (By Weight) of Recycled Material. When a Contract <br /> 45 does not include Work that requires the use of a material that is included in the <br /> 46 requirements for using materials the Contractor may state in their plan that no recycled <br /> 47 materials are proposed for use. <br /> 48 <br /> I <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.