Laserfiche WebLink
Regulatory Distance From <br /> Posted Speed Traveled Way <br /> ' 35 mph or less (Feet)10 * <br /> 40 mph 15 <br /> ' 45 to 55 mph 20 <br /> 60 mph or greater 30 <br /> * or 2-feet beyond the outside edge of sidewalk <br /> ' Minimum Work Zone Clear Zone Distance <br /> 1-07,24,RTF <br /> 1-07.24 Rights of Way <br /> (July 23, 2015 APWA GSP) <br /> Delete this section and replace it with the following: <br /> Street Right of Way lines, limits of easements, and limits of construction permits are <br /> ' indicated in the Plans. The Contractor's construction activities shall be confined within <br /> these limits, unless arrangements for use of private property are made. <br /> ' Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> way and easements, both permanent and temporary, necessary for carrying out the <br /> work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> ' Contractor's attention by a duly issued Addendum. <br /> Whenever any of the work is accomplished on or through property other than public <br /> Right of Way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> easement agreement obtained by the Contracting Agency from the owner of the private <br /> property. Copies of the easement agreements may be included in the Contract <br /> Provisions or made available to the Contractor as soon as practical after they have been <br /> 1 obtained by the Engineer. <br /> Whenever easements or rights of entry have not been acquired prior to advertising, <br /> these areas are so noted in the Plans. The Contractor shall not proceed with any portion <br /> of the work in areas where right of way, easements or rights of entry have not been <br /> acquired until the Engineer certifies to the Contractor that the right of way or easement is <br /> ' available or that the right of entry has been received. If the Contractor is delayed due to <br /> acts of omission on the part of the Contracting Agency in obtaining easements, rights of <br /> entry or right of way, the Contractor will be entitled to an extension of time. The <br /> Contractor agrees that such delay shall not be a breach of contract. <br /> Each property owner shall be given 48 hours notice prior to entry by the Contractor. <br /> This includes entry onto easements and private property where private improvements <br /> must be adjusted. <br /> The Contractor shall be responsible for providing, without expense or liability to the <br /> Contracting Agency, any additional land and access thereto that the Contractor may <br /> desire for temporary construction facilities, storage of materials, or other Contractor <br /> needs. However, before using any private property, whether adjoining the work or not, <br /> the Contractor shall file with the Engineer a written permission of the private property <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439); COE#3628 49 November 16, 2016 <br />