My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
acceptance of the contract. The Contractor shall retain these records for that period. ' <br /> The Contractor shall also guarantee that these records of all Subcontractors and lower <br /> tier Subcontractors shall be available and open to similar inspection or audit for the <br /> same time period. <br /> 1-08.1.RTF <br /> 1-08.1 Subcontracting , <br /> (August 24, 2016 APWA GSP) <br /> Delete the eighth paragraph and replace it with the following: ' <br /> On all projects funded with federal assistance the Contractor shall submit "Monthly <br /> Report of Amounts Credited as DBE Participation" (form 422-103 EF) on a monthly <br /> basis, in which DBE Work is accomplished, for every month in which the Contract is <br /> active or upon completion of the project, as appropriate. The monthly reports are due on <br /> the 20th of the month following the end of the previous month. ' <br /> COE 1-08 3(2)A,RTF <br /> 1-08.3(2)A Type A Progress Schedule <br /> (March 13, 2012 APWA GSP) <br /> Revise this section to read: <br /> The Contractor shall submit $$ 5 $$ copies of a Type A Progress Schedule no later <br /> than at the preconstruction conference, or some other mutually agreed upon submittal <br /> time. The schedule may be a critical path method (CPM) schedule, bar chart, or other <br /> standard schedule format. Regardless of which format used, the schedule shall identify <br /> the critical path. The Engineer will evaluate the Type A Progress Schedule and approve <br /> or return the schedule for corrections within 15 calendar days of receiving the submittal. , <br /> 1-08.4.RTF <br /> 1-08.4 Prosecution of Work ' <br /> Delete this section and replace it with the following: <br /> 1-08.4 Notice to Proceed and Prosecution of Work <br /> (July 23, 2015 APWA GSP) <br /> Notice to Proceed will be given after the contract has been executed and the contract <br /> bond and evidence of insurance have been approved and filed by the Contracting <br /> Agency. The Contractor shall not commence with the work until the Notice to Proceed <br /> has been given by the Engineer. The Contractor shall commence construction activities <br /> on the project site within ten days of the Notice to Proceed Date, unless otherwise <br /> approved in writing. The Contractor shall diligently pursue the work to the physical <br /> completion date within the time specified in the contract. Voluntary shutdown or slowing <br /> of operations by the Contractor shall not relieve the Contractor of the responsibility to <br /> complete the work within the time(s) specified in the contract. <br /> When shown in the Plans, the first order of work shall be the installation of high visibility <br /> fencing to delineate all areas for protection or restoration, as described in the Contract. <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439); COE#3628 54 November 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.