Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation of high visibility fencing adjacent to the roadway shall occur after the <br /> placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). <br /> ' Upon construction of the fencing, the Contractor shall request the Engineer to inspect <br /> the fence. No other work shall be performed on the site until the Contracting Agency has <br /> accepted the installation of high visibility fencing, as described in the Contract. <br /> 1-08.5.GR1 <br /> Time for Completion <br /> ' 1-08.5.INSTZ GR1 <br /> Section 1-08.5 is supplemented with the following: <br /> ' <br /> F1-08.5.0P77-WORKING DA YSDOCX <br /> (March 13, 1995) <br /> This project shall be physically completed within *** 100 *** working days. <br /> ' 1-08.5Option.A.RTF <br /> 1-08.5 Time for Completion <br /> (September 12, 2016 APWA GSP, Option A) <br /> Revise the third and fourth paragraphs to read: <br /> ' Contract time shall begin on the first working day following the Notice to Proceed Date. <br /> Each working day shall be charged to the contract as it occurs, until the contract work is <br /> physically complete. If substantial completion has been granted and all the authorized <br /> working days have been used, charging of working days will cease. Each week the <br /> Engineer will provide the Contractor a statement that shows the number of working days: <br /> (1) charged to the contract the week before; (2) specified for the physical completion of <br /> the contract; and (3) remaining for the physical completion of the contract. The <br /> statement will also show the nonworking days and any partial or whole day the Engineer <br /> ' declares as unworkable. Within 10 calendar days after the date of each statement, the <br /> Contractor shall file a written protest of any alleged discrepancies in it. To be considered <br /> by the Engineer, the protest shall be in sufficient detail to enable the Engineer to <br /> ascertain the basis and amount of time disputed. By not filing such detailed protest in <br /> that period, the Contractor shall be deemed as having accepted the statement as <br /> correct. If the Contractor is approved to work 10 hours a day and 4 days a week (a 4-10 <br /> schedule) and the fifth day of the week in which a 4-10 shift is worked would ordinarily <br /> be charged as a working day then the fifth day of that week will be charged as a working <br /> day whether or not the Contractor works on that day. <br /> ' Revise the sixth paragraph to read: <br /> The Engineer will give the Contractor written notice of the completion date of the <br /> contract after all the Contractor's obligations under the contract have been performed by <br /> the Contractor. The following events must occur before the Completion Date can be <br /> established: <br /> 1 1. The physical work on the project must be complete; and <br /> 2. The Contractor must furnish all documentation required by the contract and required <br /> by law, to allow the Contracting Agency to process final acceptance of the contract. <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 55 November 16, 2016 <br />