Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 PriorPh Physical t ys cal Completion the Contractor shall report the quantity of recycled <br /> 2 materials that were utilized in the construction of the project for each of the items listed <br /> I3 in Section 9-03.21. The report shall include hot mix asphalt, recycled concrete <br /> 4 aggregate, recycled glass, steel furnace slag and other recycled materials (e.g. <br /> 5 utilization of on-site material and aggregates from concrete returned to the supplier). <br /> I 6 The Contractor's report shall be provided on DOT Form 350-075 Recycled Materials <br /> 7 Reporting. <br /> 8 <br /> 9 1-06.6(1) Recycling of Aggregate and Concrete Materials <br /> 10 <br /> 11 1-06.6(1)A General <br /> I 12 The minimum quantity of recycled concrete aggregate shall be 25 percent of the total <br /> 13 quantity of aggregate that is incorporated into the Contract for those items listed in <br /> 14 Section 9-03.21(1)E Table on Maximum Allowable Percent (By Weight) of Recycled <br /> I15 <br /> 16 Material that allow the use of recycled concrete aggregate. The percentage of recycled <br /> material incorporated into the project for meeting the required percentage will be <br /> 17 calculated in tons based on the quantity of recycled concrete used on the entire <br /> 18 Contract and not as individual items. <br /> I19 <br /> 20 If the Contractor's total cost for Work with recycled concrete aggregate is greater than <br /> 21 without the Contractor may choose to not use recycled concrete aggregate. When the <br /> 1 22 Contractor does not meet the minimum requirement of 25 percent recycled concrete <br /> 23 aggregate for the Contract due to costs or any other reason the following shall be <br /> 24 submitted: <br /> I 25 <br /> 26 1. A cost estimate for each material listed in Section 9-03.21(1)E that is utilized <br /> 27 on the Contract. The cost estimate shall include the following: <br /> I 28 <br /> 29 a. The estimated costs for the Work for each material with 25 percent <br /> 30 recycled concrete aggregate. The cost estimate shall include for each <br /> I 31 material a copy of the price quote from the supplier with the lowest total <br /> 32 cost for the Work. <br /> 33 <br /> I <br /> 34 b. The estimated costs for the Work for each material without recycled <br /> 35 concrete aggregate. <br /> 36 <br /> 37 The Contractor's cost estimates shall be submitted as an attachment to the Recycled <br /> I <br /> 38 Materials Reporting form. <br /> 39 <br /> 40 1-07.AP1 <br /> 1 41 Section 1-07, Legal Relations and Responsibilities to the Public <br /> 42 August 1, 2016 <br /> I43 1-07.1 Laws to be Observed <br /> 44 In the second to last sentence of the third paragraph, "WSDOT" is revised to read <br /> I 45 "Contracting Agency". <br /> 46 <br /> 47 1-07.2(2) State Sales Tax: WAC 458-20-170 — Retail Sales Tax <br /> I 48 The last three sentences of the first paragraph are deleted and replaced with the following <br /> 49 new sentence: <br /> 50 <br /> I <br /> I AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.