Laserfiche WebLink
1 5-04.2(1)A Mix Designs Containing RAP and/or RAS <br /> 2 Mix designs are classified by the RAP and/or RAS content as shown in Table <br /> 3 2. <br /> 4 <br /> Table 2 <br /> Mix Design Classification Based on RAP/RAS Content ' <br /> RAP/RAS Classification RAP/RAS Content' <br /> Low RAP/No RAS 0% <_ RAP% 5 20% and RAS% _ <br /> 0% <br /> 1 <br /> High RAP/Any RAS 20% < RAP% <_ Maximum <br /> Allowable RAP2 <br /> and/or <br /> 0% < RAS% <_ Maximum <br /> Allowable RAS2 <br /> 'Percentages in this table are by total weight of HMA <br /> 2See Table 4 to determine the limits on the maximum amount RAP <br /> and/or RAS. <br /> 5 <br /> 6 5-04.2(1)A1 Low RAP/No RAS — Mix Design Submittals for Placement <br /> 7 on QPL <br /> 8 For Low RAP/No RAS mix designs, comply with the following additional <br /> 9 requirements: <br /> 10 <br /> 11 1. Develop the mix design without the inclusion of RAP. <br /> 12 <br /> 13 2. The asphalt binder grade shall be the grade indicated in the Bid <br /> 14 item name or as otherwise required by the Contract. <br /> 15 <br /> 16 3. Do not submit samples of RAP with these mix designs. <br /> 17 <br /> 18 4. Testing RAP or RAS stockpiles is not required for obtaining <br /> 19 approval for placing these mix designs on the QPL. <br /> 20 <br /> 21 5-04.2(1)A2 High RAP/Any RAS - Mix Design Submittals for <br /> 22 Placement on QPL <br /> 23 For High RAP/Any RAS mix designs, comply with the following additional <br /> 24 requirements: <br /> 25 <br /> 26 1. For mix designs with any RAS, test the RAS stockpile (and RAP <br /> 27 stockpile if any RAP is in the mix design) in accordance with <br /> 28 Table 3. <br /> 29 <br /> 30 2. For High RAP mix designs with no RAS, test the RAP stockpile <br /> 31 in accordance with Table 3. <br /> 32 <br /> 33 3. For mix designs with High RAP/Any RAS, construct a single <br /> 34 stockpile for RAP and a single stockpile for RAS and isolate <br /> 35 (sequester) these stockpiles from further stockpiling before <br /> 36 beginning development of the mix design. Test the RAP and <br /> 37 RAS during stockpile construction as required by item 1 and 2 I 38 above. Use the test data in developing the mix design, and report <br /> 39 the test data to the Contracting Agency on WSDOT Form 350- <br /> 1 <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> 111 <br /> Revised: 8/1/16 <br />