My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 When specified in the Contract, provide reference lines for vertical control. <br /> I3 Place reference lines on both outer edges of the Traveled Way of each <br /> 4 Roadway. Horizontal control utilizing the reference line is permitted. <br /> 5 Automatically control the grade and slope of intermediate lanes by means of <br /> I 6 reference lines or a mat referencing device and a slope control device.When <br /> 7 the finish of the grade prepared for paving is superior to the established <br /> 8 tolerances and when, in the opinion of the Engineer, further improvement to <br /> I 9 the line, grade, cross-section, and smoothness can best be achieved without <br /> 10 the use of the reference line, a mat referencing device may be substituted for <br /> 11 the reference line. Substitution of the device will be subject to the continued <br /> I12 <br /> 13 approval of the Engineer. A joint matcher may be used subject to the approval <br /> of the Engineer. The reference line may be removed after completion of the <br /> 14 first course of HMA when approved by the Engineer. Whenever the Engineer <br /> I15 <br /> 16 determines that any of these methods are failing to provide the necessary <br /> vertical control, the reference lines will be reinstalled by the Contractor. <br /> 17 <br /> 18 Furnish and install all pins, brackets, tensioning devices, wire, and accessories <br /> I19 necessary for satisfactory operation of the automatic control equipment. <br /> 20 <br /> 21 If the paving machine in use is not providing the required finish, the Engineer <br /> I <br /> 22 may suspend Work as allowed by Section 1-08.6. <br /> 23 <br /> 24 5-O4.3(3)D Material Transfer Device or Material Transfer Vehicle <br /> I 25 Use a material transfer device (MTD) or material transfer vehicle (MTV) to <br /> 26 deliver the HMA from the hauling equipment to the paving machine for any lift <br /> 27 in (or partially in) the top 0.30 feet of the pavement section used in traffic <br /> I 28 lanes. However, an MTD/V is not required for HMA placed in irregularly <br /> 29 shaped and minor areas such as tapers and turn lanes, or for HMA mixture <br /> 30 that is accepted by Visual Evaluation. At the Contractor's request the Engineer <br /> I <br /> 31 <br /> 32 may approve paving without an MTD/V; the Engineer will determine if an <br /> equitable adjustment in cost or time is due. If a windrow elevator is used, the <br /> 33 Engineer may limit the length of the windrow in urban areas or through <br /> 34 intersections. <br /> I35 <br /> 36 To be approved for use, an MTV: <br /> 37 <br /> I <br /> 38 1. Shall be a self-propelled vehicle, separate from the hauling vehicle or <br /> 39 paver. <br /> 40 <br /> I <br /> 41 2. Shall not connected to the hauling vehicle or paver. <br /> 42 <br /> 43 3. May accept HMA directly from the haul vehicle or pick up HMA from a <br /> I <br /> 44 <br /> 45 windrow. <br /> 46 4. Shall mix the HMA after delivery by the hauling equipment and prior <br /> I <br /> 47 to placement into the paving machine. <br /> 48 <br /> 49 5. Shall mix the HMA sufficiently to obtain a uniform temperature <br /> 50 throughout the mixture. <br /> 51 <br /> 52 To be approved for use, an MTD: <br /> I <br /> I AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.