My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> 2 1. Shall be positively connected to the paver. <br /> 3 I 4 2. May accept HMA directly from the haul vehicle or pick up HMA from a <br /> 5 windrow. <br /> 6 <br /> 7 3. Shall mix the HMA after delivery by the hauling equipment and prior <br /> 8 to placement into the paving machine. <br /> 9 <br /> 10 4. Shall mix the HMA sufficiently to obtain a uniform temperature <br /> 11 throughout the mixture. <br /> 12 <br /> 13 5-04.3(3)E Rollers <br /> 14 Operate rollers in accordance with the manufacturer's recommendations. <br /> 15 When requested by the Engineer, provide a Type 1 Working Drawing of the <br /> 16 manufacturer's recommendation for the use of any roller planned for use on <br /> 17 the project. Do not use rollers that crush aggregate, produce pickup or <br /> 18 washboard, unevenly compact the surface, displace the mix, or produce other <br /> 19 undesirable results. <br /> 20 <br /> 21 5-04.3(4) Preparation of Existing Paved Surfaces <br /> 22 Before constructing HMA on an existing paved surface, the entire surface of the <br /> 23 pavement shall be clean. Entirely remove all fatty asphalt patches, grease <br /> 24 drippings, and other deleterious substances from the existing pavement to the <br /> 25 satisfaction of the Engineer. Thoroughly clean all pavements or bituminous <br /> 26 surfaces of dust, soil, pavement grindings, and other foreign matter. Thoroughly <br /> 27 remove any cleaning or solvent type liquids used to clean equipment spilled on the <br /> 28 pavement before paving proceeds. Fill all holes and small depressions with an I 29 appropriate class of HMA. Level and thoroughly compact the surface of the patched <br /> 30 area. <br /> 31 <br /> 32 Apply a uniform coat of asphalt (tack coat) to all paved surfaces on which any <br /> 33 course of HMA is to be placed or abutted. Apply tack coat to cover the cleaned <br /> 34 existing pavement with a thin film of residual asphalt free of streaks and bare spots. <br /> 35 Apply a heavy application of tack coat to all joints. For Roadways open to traffic, <br /> 36 limit the application of tack coat to surfaces that will be paved during the same <br /> 37 working shift. Equip the spreading equipment with a thermometer to indicate the <br /> 38 temperature of the tack coat material. <br /> 39 <br /> 40 Do not operate equipment on tacked surfaces until the tack has broken and cured. <br /> 41 Repair tack coat damaged by the Contractor's operation, prior to placement of the <br /> 42 HMA. <br /> 43 <br /> 44 Unless otherwise approved by the Engineer, use CSS-1, CSS-1 h,STE-1, or I 45 Performance Graded (PG) asphalt for tack coat. The CSS-1 and CSS-1 h emulsified <br /> 46 asphalt may be diluted with water at a rate not to exceed one part water to one part <br /> 47 emulsified asphalt. Do not allow the tack coat material to exceed the maximum <br /> 48 temperature recommended by the asphalt supplier. <br /> 49 <br /> 50 When shown in the Plans, prelevel uneven or broken surfaces over which HMA is <br /> 51 to be placed by using an asphalt paver, a motor patrol grader, or by hand raking, as 1 <br /> 52 approved by the Engineer. <br /> 1 <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.