My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1 <br /> by the Engineer. The Contracting Agency will not test the split of the <br /> 2 sample with the same equipment or by the same tester that ran the <br /> I3 original acceptance test. The sample will be tested for a complete <br /> 4 gradation analysis, asphalt binder content, and Va, and the results of <br /> 5 the retest will be used for the acceptance of the HMA mixture in place <br /> 1 6 of the original mixture sublot sample test results. The cost of testing <br /> 7 will be deducted from any monies due or that may come due the <br /> 8 Contractor under the Contract at the rate of $250 per sample. <br /> I9 <br /> 10 5-04.3(9)C Mixture Acceptance— Nonstatistical Evaluation <br /> 11 5-04.3(9)C1 Mixture Nonstatistical Evaluation — Lots, Sublots, <br /> I 12 Sampling, Test Section, Testing, Retests <br /> 13 For HMA mixture accepted by Nonstatistical Evaluation, comply with <br /> 14 the requirements in Table 13: <br /> I 15 <br /> Table 13 <br /> Nonstatistical Evaluation <br /> Lots, Sublots, Sampling, Test Section, Testing, Retests <br /> IComply with the <br /> Comply with the Specifications Below Requirements of the <br /> Section for: <br /> I <br /> Lots and Sublots Section 5-04.3(9)B1 Statistical Evaluation <br /> Sampling Section 5-04.3(9)62 Statistical Evaluation <br /> I Acceptance Tests Section 5-04.3(9)B3 Statistical Evaluation <br /> Retests Section 5-04.3(9)B7 Statistical Evaluation <br /> 16 <br /> I 17 5-04.3(9)C2 Mixture Nonstatistical Evaluation -Acceptance <br /> 18 Each mixture lot of HMA produced under Nonstatistical Evaluation, <br /> 19 for which all sublot acceptance test results (required by Table 13) fall <br /> 20 within the Job Mix Formula Tolerances for Nonstatistical Evaluation in <br /> 21 Section 9-03.8(7), will be accepted at the unit Contract price with no <br /> 22 further evaluation. <br /> I 23 <br /> 24 5-04.3(9)C3 Mixture Nonstatistical Evaluation — Out of Tolerance <br /> 25 Procedures <br /> I 26 Each mixture lot of HMA produced under Nonstatistical Evaluation, <br /> 27 for which any sublot acceptance test result (required by Table 13) <br /> 28 falls outside of the Job Mix Formula Tolerances for Nonstatistical <br /> 29 Evaluation in Section 9-03.8(7), shall be evaluated in accordance with <br /> I 30 Section 1-06.2 and Table 14 to determine a Job Mix Compliance <br /> 31 Price Adjustment. <br /> 32 <br /> ITable 14 <br /> Nonstatistical Evaluation — Out of Tolerance Procedures <br /> Comply with the Following' <br /> Pay Factors2 Section 5-04.3(9)B4 <br /> Composite Pay Factors3 Section 5-04.3(9)B5 <br /> Price Adjustments Section 5-04.3(9)B6 <br /> I <br /> 'When less than three mixture sublots exist, backup samples of <br /> the existing mixture sublots shall be tested to provide a minimum <br /> I <br /> I AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.