Laserfiche WebLink
I1 6-19.3(6)F Use of Access Tubes for TIP Testing Under the Thermal Probe Method <br /> 2 The Contractor may use access tubes for TIP testing under the thermal probe method. <br /> 1 3 Access tubes shall be cared for in accordance with Section 6-19.3(6)C. Prior to TIP <br /> 4 testing under the thermal probe method, the water in each tube shall be removed, <br /> 5 collected, and stored in an insulated container. The access tube shall be blown dry and <br /> I <br /> 6 <br /> 7 swabbed to remove residual water. After TIP testing, the collected and stored tube <br /> water shall be introduced back into the access tube. New potable water may be used, <br /> 8 provided the water temperature is not more than 10°F cooler than the average concrete <br /> I 9 temperature measured by the probe. <br /> 10 <br /> 11 6-19.3(6)A Shafts Requiring CSL Access Tubes <br /> I 12 This section, including title, is revised to read: <br /> 13 <br /> 14 6-19.3(6)A Shafts Requiring Access Tubes <br /> I 15 The Contractor shall furnish and install access tubes in all shafts receiving CSL testing <br /> 16 or the thermal probe method of TIP testing, except as otherwise noted in Section 6- <br /> 17 19.3(1)B1. <br /> 18 <br /> I <br /> 19 6-19.3(6)B Orientation and Assembly of the CSL Access Tubes <br /> 20 This section's title is revised to read: <br /> 21 <br /> 1 <br /> 22 6-19.3(6)B Orientation and Assembly of the Access Tubes <br /> 23 <br /> 24 6-19.3(6)C Care for CSL Access Tubes from Erection through CSL Testing <br /> 25 This section's title is revised to read: <br /> 26 <br /> 27 6-19.3(6)C Care for Access Tubes from Erection Through Nondestructive QA <br /> I 28 Testing <br /> 29 <br /> 30 The second sentence is revised to read: <br /> I 31 <br /> 32 The Contractor shall keep all of a shaft's access tubes full of water through the <br /> 33 completion of nondestructive QA testing of that shaft. <br /> III 34 <br /> 35 6-19.3(7)1 Requirements for Placing Concrete Above the Top of Shaft <br /> 36 This section is revised to read: <br /> 37 <br /> I38 Concrete shall not be placed above the top of shaft (for column splice zones, columns, <br /> 39 footings, or shaft caps) until the Contractor receives the Engineer's acceptance of <br /> 40 nondestructive QA testing, if performed at that shaft, and acceptance of the shaft. <br /> I 41 <br /> 42 6-19.3(9) Nondestructive Testing of Shafts (Crosshole Sonic Log (CSL) <br /> 43 Testing) <br /> I 44 This section, including title, is revised to read: <br /> 45 <br /> 46 6-19.3(9) Nondestructive QA Testing of Shafts <br /> I <br /> 47 <br /> 48 The Contractor shall provide nondestructive QA testing and analysis on all shafts with <br /> access tubes or thermal wires and TAPs facilitating the testing (See Section 6- <br /> 49 19.3(1)B). The testing and analysis shall be performed by the testing organizations <br /> I 50 identified by the Contractor's submittal in accordance with Section 6-19.3(2)D. <br /> 51 <br /> I <br /> I <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/16 <br />