My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The Engineer may direct that additional testing be performed at a shaft if anomalies or a I <br /> 2 soft bottom are detected by the Contractor's testing. If additional testing at a shaft <br /> 3 confirms the presence of a defect(s) in the shaft, the testing costs and the delay costs <br /> 4 resulting from the additional testing shall be borne by the Contractor in accordance with <br /> 5 Section 1-05.6. If the additional testing indicates that the shaft has no defect, the testing <br /> 6 costs and the delay costs resulting from the additional testing will be paid by the <br /> 7 Contracting Agency in accordance with Section 1-05.6, and, if the shaft construction is <br /> 8 on the critical path of the Contractor's schedule, a time extension equal to the delay <br /> 9 created by the additional testing will be granted in accordance with Section 1-08.8. <br /> 10 <br /> 11 6-19.3(9)A Schedule of CSL Testing <br /> 12 This section, including title, is revised to read: <br /> 13 <br /> 14 6-19.3(9)A TIP Testing Using Thermal Probes or CSL Testing <br /> 15 If selected as the nondestructive QA testing method by the Contractor, TIP testing using <br /> 16 thermal probes, or CSL testing shall be performed after the shaft concrete has cured at <br /> 17 least 96 hours. Additional curing time prior to testing may be required if the shaft <br /> 18 concrete contains admixtures, such as set retarding admixture or water-reducing <br /> 19 admixture, added in accordance with Section 6-02.3(3). The additional curing time prior <br /> 20 to testing required under these circumstances shall not be grounds for additional <br /> 21 compensation or extension of time to the Contractor in accordance with Section 1-08.8. <br /> 22 <br /> 23 6-19.3(9)B Inspection of CSL Access Tubes <br /> 24 This section's title is revised to read: <br /> 25 <br /> 26 6-19.3(9)B Inspection of Access Tubes <br /> 27 <br /> 28 6-19.3(9)C Engineer's Final Acceptance of Shafts <br /> 29 This section, including title, is revised to read: <br /> 30 <br /> 31 6-19.3(9)C TIP Testing With Thermal Wires and TAPs <br /> 32 If selected as the nondestructive QA testing method by the Contractor, TIP testing with <br /> 33 thermal wires and TAPs (See Section 6-19.3(6)E) shall be performed. The TIP testing <br /> 34 shall commence at the beginning of the concrete placement operation, recording <br /> 35 temperature readings at 15-minute intervals until the peak temperature is captured in <br /> 36 the data. Additional curing time may be required if the shaft concrete contains <br /> 37 admixtures, such as set retarding admixture or water-reducing admixture, added in <br /> 38 accordance with Section 6-02.3(3). The additional curing time required under these <br /> 39 circumstances shall not be grounds for additional compensation or extension of time to <br /> 40 the Contractor in accordance with Section 1-08.8. <br /> 41 <br /> 42 TIP testing shall be conducted at all shafts in which thermal wires and TAPs have been <br /> 43 installed for thermal wire analysis (Section 6-19.3(6)A). <br /> 44 <br /> 45 6-19.3(9)D Requirements to Continue Shaft Excavation Prior to Acceptance of <br /> 46 First Shaft <br /> 47 This section, including title, is revised to read: <br /> 48 <br /> 49 6-19.3(9)D Nondestructive QA Testing Results Submittal <br /> 50 The Contractor shall submit the results and analysis of the nondestructive QA testing for <br /> 51 each shaft tested. The Contractor shall submit the test results within three working days <br /> 52 of testing. Results shall be a Type 1 Working Drawing presented in a written report. <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.