My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> If the project has FHWA funding and requires DBE Written Confirmation Document(s) or <br /> Good Faith Effort (GFE) Documentation, then to be considered responsive, the Bidder <br /> shall submit written Confirmation Documentation from each DBE firm listed on the <br /> Bidder's completed DBE Utilization Certification, form 272-056 EF, as required by <br /> Section 1-02.6. The DBE Written Confirmation Document(s) and/or GFE (if any) shall be <br /> received either with the Bid Proposal or as a Supplement to the Bid. The document(s) <br /> shall be received no later than 24 hours (not including Saturdays, Sundays and <br /> Holidays) after the time for delivery of the Bid Proposal. <br /> If submitted after the Bid Proposal is due, the document(s) must be submitted in a <br /> sealed envelope labeled the same as for the Proposal, with "DBE Supplemental <br /> Information" added. All other information required to be submitted with the Bid Proposal <br /> must be submitted with the Bid Proposal itself, at the time stated in the Call for Bids. I <br /> The Contracting Agency will not open or consider any Bid Proposal that is received after <br /> the time specified in the Call for Bids for receipt of Bid Proposals, or received in a <br /> location other than that specified in the Call for Bids. The Contracting Agency will not <br /> open or consider any DBE confirmations or GFE documentation proposal that is <br /> received after the time specified above, or received in a location other than that specified <br /> in the Call for Bids. <br /> 1-02.10.RTF <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> (July 23, 2015 APWA GSP) <br /> Delete this section, and replace it with the following: I <br /> After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may <br /> withdraw, revise, or supplement it if: <br /> 1. The Bidder submits a written request signed by an authorized person and <br /> physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 2. The Contracting Agency receives the request before the time set for receipt of <br /> Bid Proposals, and <br /> 3. The revised or supplemented Bid Proposal (if any) is received by the <br /> Contracting Agency before the time set for receipt of Bid Proposals. <br /> If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> unopened Proposal package to the Bidder. The Bidder must then submit the revised or <br /> supplemented package in its entirety. If the Bidder does not submit a revised or <br /> supplemented package, then its bid shall be considered withdrawn. <br /> Late revised or supplemented Bid Proposals or late withdrawal requests will be date <br /> recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed <br /> requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> COE 1-02.12 Opening Date.RTF <br /> 1-02.12 PUBLIC OPENING OF PROPOSALS <br /> Section 1-02.12 is supplemented with the following: <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 10 November 16, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.