My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I The bid opening date for this project is $$ Jan 10th, 2017 $$. Bids received will be <br /> publicly opened and read after 2:00pm on this date. <br /> IBids will be opened at: <br /> City of Everett <br /> I Wall Street Building <br /> 8th Floor Hearing Room <br /> 2930 Wetmore Ave, <br /> Everett, WA 98201 <br /> I <br /> 1-02.13,RTF <br /> 1-02.13 Irregular Proposals <br /> 1 (January 4, 2016 APWA GSP) <br /> Delete this section and replace it with the following: <br /> I1. A proposal will be considered irregular and will be rejected if: <br /> a. The Bidder is not prequalified when so required; <br /> I b. The authorized proposal form furnished by the Contracting Agency is not <br /> used or is altered; <br /> c. The completed proposal form contains any unauthorized additions, deletions, <br /> I d. alternate Bids, or conditions; <br /> The Bidder adds provisions reserving the right to reject or accept the award, <br /> or enter into the Contract; <br /> e. A price per unit cannot be determined from the Bid Proposal; <br /> III f. The Proposal form is not properly executed; <br /> g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> applicable, as required in Section 1-02.6; <br /> I h. The Bidder fails to submit or properly complete a Disadvantaged Business <br /> Enterprise Certification, if applicable, as required in Section 1-02.6; <br /> i. The Bidder fails to submit written confirmation from each DBE firm listed on <br /> 1 the Bidder's completed DBE Utilization Certification that they are in <br /> agreement with the bidders DBE participation commitment, if applicable, as <br /> required in Section 1-02.6, or if the written confirmation that is submitted fails <br /> I j to meet the requirements of the Special Provisions; <br /> The Bidder fails to submit DBE Good Faith Effort documentation, if <br /> applicable, as required in Section 1-02.6, or if the documentation that is <br /> I submitted fails to demonstrate that a Good Faith Effort to meet the Condition <br /> of Award was made; <br /> k. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> the material terms of the Bid invitation; or <br /> I I. More than one proposal is submitted for the same project from a Bidder <br /> under the same or different names. <br /> I 2. A Proposal may be considered irregular and may be rejected if: <br /> a. The Proposal does not include a unit price for every Bid item; <br /> I <br /> CITYWIDE INTERSECTION SIGNING <br /> 1 FED AID#HSIP-000S(439);COE#3628 11 November 30,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.