My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/07/25 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/07/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:42:35 AM
Creation date
3/13/2017 11:41:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/25/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A 5 <br /> SCOPE OF WORK <br /> Phase Three: Abatement Contractor Overview and Air Sampling <br /> Management <br /> 1. ALKAI will provide oversight of the selected Asbestos Abatement <br /> Contractor's actions to assure that the Contractor meets the Specifications <br /> and adheres to all Federal, State, and Local PSCAA Regulations. This <br /> includes the collection of the EPA-required Phase Contrast Microscopy <br /> (PCM) air samples and laboratory analysis. <br /> 2. ALKAI will provide Final Clean Air Testing, Analysis, and "Final Clean" <br /> Report. This includes the collection of the AHERA-required PCM "Final <br /> Clean" air samples for laboratory analysis. An "Asbestos Free" and "Safe <br /> for Re-entry" Certification document will be prepared for the worker's re- <br /> entry to the abatement areas. <br /> r <br /> Page 12 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.