My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/07/25 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/07/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:42:35 AM
Creation date
3/13/2017 11:41:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/25/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> 6 SCOPE OF WORK <br /> 1. Review and approve Shop Drawings, Product Data and Samples, but only for the limited <br /> purpose of checking for conformance with information given and the concept expressed in the <br /> contract documents. <br /> 2.Answer Contractor's questions during construction. <br /> 3.Make bi-weekly site visits, including a final visit,to develop the Final Punchlist. <br /> ADDITIONAL SERVICES(If requested by the City of Everett) <br /> 1. Preparing materials for and attending public presentations, meetings or hearings unless <br /> specifically defined in the Basic Services part of the Scope of Work. <br /> 2.Revising drawings previously approved by Owner,Tenants or Governmental Authorities. <br /> 3. Preparing documents for Change Directives, Change Order Proposals, or Change Orders and <br /> Drawings for changes not under the control of the Architect or Architect's consultants. <br /> 4. Value Engineering participation and implementation. The cost of the consulting firm for <br /> participation in Value Engineering study and implementation of the accepted ideas generated <br /> during the study. <br /> 5. Computer Energy Code Analysis of Life Cycle Cost Analysis if required by the Owner or <br /> Governmental Approvals. <br /> 6. Post Construction Services after Substantial Completion of the project and"follow up" services <br /> related to the construction and operation of the building systems after the final completion. <br /> 7.Structural analysis of the existing building. <br /> 8.Preparation of detailed"As Built"record drawings. <br /> 9.Furnishings selection and specification. <br /> CONSULTANT SERVICES NOT INCLUDED <br /> 1.Economic analysis/life cycle costing. <br /> 2.Environmental impact and mitigation services. <br /> 3. Scheduling Consultants <br /> 4.Graphic Sign Consultants. <br /> 5. Structural Engineering. <br /> 6.Mechanical Engineering. <br /> 7.Electrical Engineering. <br /> 8.Fire Protection Design. <br /> 9.Acoustical Engineering. <br /> 10. Security Consultant. <br /> 11.Hazardous material identification. <br /> 12. Special inspection of structural systems when required by the Building Official. <br /> 13. Soils Reports/Engineering. <br /> 2. Reports <br /> [EXAMPLES] <br /> Report Frequency , Contents <br /> 4c' <br /> Page 11 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.