Laserfiche WebLink
6. Show location of source of heat. Specify type of heat and equipment efficiency. <br /> 7. R-3 Pipe insulation is required on ALL hot water piping in conditioned and non- <br /> conditioned spaces. <br /> 8. Provide minimum 22"x 30" attic access. Insulate access to R-49 min. Provide min 30" <br /> clear over access opening. <br /> 9. Provide minimum 50 CFM exhaust fan in bathroom. <br /> Please prepare a response letter showing where each item in this correction letter is <br /> addressed on the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> TonyLee <br /> Building Official <br /> 425-257-8810 <br /> Email: tlee(a everettwa.gov <br />