Laserfiche WebLink
1 ! � <br /> � <br /> � <br /> � Botesch, Nash & Hall <br /> Architects, P.S. <br /> August 4, 2003 Rj 6 �Q c7� G � U <br /> Mr. Tony Lee, Plans Examiner <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> RE: City of Everett- Everett Special Events Center <br /> Conference Center Tenant Improvement Project <br /> BNBH Job No. 1467 <br /> Reponses to Follow-Up Building Permit Review Comments, <br /> dated June 30, 2003 <br /> Dear Tony: <br /> Attached is a letter from Nicoli Engineering, Inc. in response to your follow-up concems for the <br /> ceiling "clouds" in the 2nd Level Banquet Room. Please advise if you have continuing concems <br /> for this matter. <br /> �Iso attached here�tidth are 2 copies of the praject drawing sets revised to show all addendum <br /> revisions, as you requested. This set includes special drawing sheet A11.4 showing a complete <br /> rypical ceiling "cloud", with views from above and below, to indicate the construction, support <br /> and bracing, as described in the previously issued architectural and special structural details. <br /> We hope that these submittals will be satisfactory and will allow you to complete your permit <br /> review actions. Let us know if there is anything further we can do to speed final approval. <br /> Please call if you have any questions. <br /> Thank you. <br /> Sincerely, <br /> BO�SC , N H 8 HALL ARCHITECTS, P.S. <br /> ' t��R�' <br /> Deric Von Schlieder, AIA <br /> Associate <br /> IIL <br /> 2915 Newitt Avenue • Everett. WA 98201 •425•259•OB68• 425•774•3341 •Fax 425�252•4334•e•mail bnh06nherch.com <br />