My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 HEWITT AVE EVERETT EVENT CENTER 2016-01-01 MF Import
>
Address Records
>
HEWITT AVE
>
2000
>
EVERETT EVENT CENTER
>
2000 HEWITT AVE EVERETT EVENT CENTER 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2017 2:11:53 PM
Creation date
3/16/2017 8:00:07 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2000
Tenant Name
EVERETT EVENT CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 � � � <br /> PUBL/L N/O/rX5 <br /> ��:� <br /> May 13, 2003 <br /> Deric Von Schlieder <br /> Botesch,Nash &Hall Architects, P.S. <br /> 2915 Hewitt Avenue <br /> Everett, WA 98201 <br /> Project: City Buildine, Conference Center <br /> Job Address: 2000 Hewitt Avenue <br /> Plan Review No: B0305-010 <br /> Dear Mr. Von Schlieder. <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised Ihat the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address building issucs only. Additional revisions or additions may be required by other <br /> departments (such as Utilitics, Planning or Fire). All references refer to the L997 Uniform Building <br /> r.ode, as amended by the State of Washington and/or thc Washington State Energy Code, 1997 <br /> edition, unless noted othenvise. <br /> This review does not cover submitted mechanical, sprinkler, electrical or plumbing documents — <br /> thesc permits must be obtained separately and may require further review and submission of plans. <br /> In order for the processing uf your application to continue, it will be necessary to provide the <br /> Quilding Di��ision with two complete new sets of drawings reflecting the corrections requested. <br /> General <br /> L The project data section on the coversheet should include M as occupancy to allow for <br /> fuwre approved usage. <br /> 3. Li�htin� calculations should be provided to show compliance with the 2001 Washington <br /> State Enerey Code to include lighting zones and convols as well as commissioning reports. <br /> �/ <br /> CIT'r OF EVEhETT• 3200 Cedar Street • Everelt, 4VA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.