Laserfiche WebLink
PRK97CFP <br /> Location Activity Highlights Map Loc. Funding 1997 1998 1999 2000 2001 2002 TOTAL <br /> (X 000) (X 000) (X 000) (X 000) (X 000) (X 000) (X 000) <br /> Legion Park improvements Rehab playground,Tennis&M/P court G,B,F $217.00 $70.10 $130.00 $47.10 $464.20 <br /> • <br /> per master plan Arboretum,greenhouse,landscape, <br /> Shelter&Hall Improvements <br /> Legion Golf Course Fairway,Tee,Green Imprvmnts, A $3,000.0 $3,000.0 <br /> per master plan Drainage Imprvmnts,Cart Paths <br /> Restrooms,Telecomm. Imprvmnts <br /> Chem.Sto Fac.,Maint Area <br /> WE Hall Golf Course Fairway,Tee,Green Imprvmnts, A $3,000.0 $3,000.0 <br /> per master plan Drainage Imprvmnts,Cart Paths <br /> Restrooms,Telecomm.Imprvmnts <br /> Chem.Sto Fac.,Maint.Area. <br /> Bayside Park Access&Parking,View Shelter, E,F,G $4.8 $80.0 $84.8 <br /> per master plan Landscp,Uitilities <br /> Snophomish River Trail Paved Trail,Lndscp,Irrigation, G,B,F $212.0 $151.5 $363.5 <br /> per master plan&DOE Cmpl Benchs&Tables,RR Xings,Restrooms <br /> (French Crk to Langus Park) Nursery Devel.,Trl Head Pkng _ <br /> Right-of-Way Trees Hewitt,Colby,Wetmore,Pacific G,F,B $62.5 $25.0 $25.0 $25.0 $137.5 <br /> Per City Streetscape Broadway,Evergreen&Other <br /> Plan main arterials. _ ..Multiple Parks Parkwide Parking Lot Overlays G $38.6 $62.1 $70.6 $51.0 $222.3 <br /> (Forest,Legion,Jackson,et.al) <br /> Multiple Parks Parkwide Tennis Court G,F $196.0 $196.0 <br /> Upgrade,(WE Hall, Clark, <br /> Garfield,Howarth, Lowell) <br /> Edgewater Park Improvements Playground,Lndscp,Tennis Court G,F,E $28.8 $50.0 $78.8 <br /> per master plan &/or M/P Court <br /> Multiple Parks Parkwide B-Ball&M/P Court G,F $11.0 $12.9 $16.4 $40.3 <br /> Upgrade,(Lowell,Garfield,Lions) _ <br /> Wiggums Hollow Improvements Playground,M/P Court,Parking G,F $25.0 $12.0 $50.0 $25.0 $112.0 <br /> per master plan Ballfield,Lndscp <br /> Multiple Parks Parkwide Restroom Renovation G,F $19.0 $37.8 $35.0 $68.0 $159.8 <br /> (Lowell,Garfield,Jackson <br /> Lions,Harborview,et.al.) <br /> Everett Story Pole Relocate,Evaluate,Restore,Reset B,D,F,G $20.0 $20.0 <br /> Total Costs $9,560 $6,126 $2,492 $4,843 $6,353 $11,215 $28,551 <br /> A=Rates B=Grants C=Loan D=Bonds E=Contributions F=General Fund G=REET H=Unknown <br /> Page 2 <br />