Laserfiche WebLink
EVERETT PUBLIC UTILITIES <br /> 1997 -2002 CAPITAL IMPROVEMENT PROGRAM , <br /> (Excluding 1996 Projects Under Construction) <br /> Funding ($ in $1,000s) <br /> PRI Method* 1996 1997 1998 1999 2000 2001 2002 TOTAL <br /> SEWER <br /> ODOR CONTROL-WPCF 1 1,4,5 400 1,600 1,400 0 0 0 0 $3,400 <br /> DEEP WELL ANODES-WPCF/MUKILTEO 4 1 0 300 0 0 0 0 0 300 <br /> CSO PLAN UPDATE/PORT GARDNER BAY'** 5 1,2,3,5 20 240 1,100 5,100 5,350 0 0 11,810 <br /> WPCF UPGRADE PLAN & IMPROVEMENTS 6 1,5 100 500 500 500 500 500 500 3,100 <br /> L.S. #4 PRESSURE LINE REPLACEMENT" 13 1,3 40 260 0 0 0 0 0 300 <br /> SANITARY SEWER SYSTEM REPLACEMENT 14 1 0 680 900 900 900 900 900 5,180 <br /> L.S. #28 REHAB 20 1 0 0 0 100 0 0 0 100 <br /> TOTAL SEWER $560 $3,580 $3,900 $6,600 $6,750 $1,400 $1,400 $24,190 <br /> STORM <br /> EVERGREEN WAY STORM DRAIN(PHASE I & II) A 1,3 200 490 0 0 0 0 0 690 <br /> OCEAN AVE. STORM DRAIN** B 1 55 130 0 0 0 0 0 185 <br /> PIGEON CREEK#1 CHANNEL IMPROV. PLAN C 1 7 0 0 0 365 0 0 372 <br /> SILVER LAKE FLOOD CONTROL PLAN D 1 0 160 540 0 0 0 0 700 <br /> SILVER LAKE MILFOIL REMOVAL E 1 130 100 50 30 30 30 0 370 . <br /> NORTH CREEK REGIONAL DETENTION POND F 1 0 0 145 690 0 ' 0 0 835 <br /> MERRILL-RING CREEK REGIONAL DETENTION POND G 1 0 0 0 0 325 200 0 525 <br /> PIGEON CREEK NO. 2 DETENTION/CHANNEL IMP. H 1 0 0 0 0 0 360 0 360 <br /> OTHER STORM DRAINAGE PROJECTS 1 0 0 0 0 0 120 720 840 <br /> TOTAL STORM $392 $880 $735 $720 $720 $710 $720 $4,877 <br /> TOTAL SEWER/STORM $952 $4,460 $4,635 $7,320 $7,470 $2,110 $2,120 $29,067 <br /> REIMBURSEMENT(WHOLESALE&PORT) (660) (414) (474) (100) (100) (100) (1,748) <br /> NET SEWER/STORM $952 $3,800 $4,221 $6,846 $7,370 $2,010 $2,020 $27,319 <br /> TOTAL WATER, SEWER, STORM $1,852 $9,460 $13,165 $14,960 $15,390 $5,990 $12,820 $73,637 <br /> NET WATER, SEWER,STORM $1,852 $8,800 $12,751 $14,486 $15,290 $5,890 $12,720 $71,889 <br /> *FUNDING METHODS: `• TO BE PART OF SANITARY SEWER SYSTEM REPLACEMENT PROJECT <br /> 1. Rates ***PORT REIMBURSEMENT IN 1997= $240,000 <br /> 2. Grants 1998= 34,000 <br /> 3. Loan(Public Works Trust Fund or State Revolving Fund) 1999= 374,000 <br /> 4. Bonds TOTAL $648,000 <br /> 5. Capital Contributions by Wholesale Customers-20% <br /> 6. Unknown <br /> copra M02 o-Nov-96 <br />