Laserfiche WebLink
Non-Motorized Transportation Plan <br /> Project Summary List <br /> Project Title Project Description Project Estimated Cost* <br /> Priority <br /> 100th Street S.E.Connector Construct bike lanes in conjunction with sidewalk HI $1,800,000 <br /> & street widening project. <br /> 112th Street Overpass Widen sidewalks on overpass to allow for bike HI $500,000 <br /> • and pedestrian use <br /> Airport Road Connector Construction of bike lanes in conjunction wtih HI $500,000 <br /> street& sidewalk widening. <br /> Harborfront-Riverfront Trail CBD connector Public access connector in the CBD between the HI $425,000 <br /> Harborfront trail system to the Riverfront Trail <br /> Interurban/Riverfront Trail connector trails Provide Connector trails between the Interurban HI $1,500,000 <br /> system & Riverfront system at 75th (Wood Creek) <br /> and 52nd <br /> Paine Field Blvd Public Access Corridor Design and construct separate bike lanes and HI $7,000,000 <br /> sidewalks for public access in conjunction with <br /> new roadway alignment. <br /> Riverfront Trail East Segment Coordinate with Snohomish County on the design HI $650,000 <br /> and development of a public access trail along <br /> Lowell River Road to Snohomish <br /> Riverfront Trail Phase II Construct second leg of trail HI $200,000 <br /> • <br /> Riverfront Trail Phase III Design and develop trail along existing right of HI $600,000 <br /> way of East Grand <br /> Riverwalk Trail Overpass Pedestrian over pass HI $400,000 <br /> Note: 'Cost Estimates based on best available analysis of Project scope <br />